To Do - St. Louis, MO Discussion View history

Revision as of 14:58, 10 August 2010 by Misterasterix (talk | contribs) (Finished I- 44 inside I- 270 loop)
Missouri Freeways
Road Segment Area Manager Date Started Status Comment
I- 44 I- 55 to I- 270 MisterAsterix 04/19/10 Complete
Outside I- 270 MisterAsterix 04/19/10 Assigned Started.
I- 55 PSB to I- 44 MisterAsterix 04/19/10 Complete ...
I- 44 to I- 255I- 270 MisterAsterix 04/19/10 Complete ...
Outside I- 255I- 270 MisterAsterix 04/19/10 In Progress Done to Arnold. Needs locking and some exit renaming
I- 64US Hwy- 40 PSB to Kingshighway MisterAsterix 04/19/10 Complete ...
Kingshighway to I- 170 MisterAsterix 04/19/10 Complete* *left unlocked until Sat images are up to date.
I- 170 to I- 270 MisterAsterix 04/19/10 In Progress Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
I- 270 to MO River MisterAsterix 04/19/10 In Progress Most exits & overpasses complete. Needs locking.
MO River to I- 70 MisterAsterix 04/19/10 In Progress Some exits & overpasses complete. Needs locking.
I- 70 PSB to I- 170 MisterAsterix 04/19/10 Complete
I- 170 to I- 270 MisterAsterix 04/19/10 Complete
I- 270 to MO River MisterAsterix 04/19/10 Complete
MO River to MO- 370 MisterAsterix 04/19/10 Complete
MO- 370 to US Hwy- 40 MisterAsterix 04/19/10 Assigned Sporadic.
I- 170 MisterAsterix 04/19/10 Complete* *Small stretch left unlocked near I- 64 until Sat images are up to date.
I- 255 MisterAsterix 04/19/10 Complete
I- 270 River to I- 170 MisterAsterix 04/19/10 Complete
I- 170 to I- 70 MisterAsterix 04/19/10 Complete
I- 70 to I- 64 MisterAsterix 04/19/10 Complete.
I- 64 to I- 44 MisterAsterix 04/19/10 In Progress Most overpasses done. Some exits named. Needs Locking.
I- 44 to I- 55 MisterAsterix 04/19/10 Complete
MO- 364 (aka Page Ave Extension) MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


Illinois Freeways
Road Segment Area Manager Date Started Status Comment
I- 55I- 70 I- 64 to I- 255 MisterAsterix 04/19/10 Complete
I- 255 to I- 270 MisterAsterix 04/19/10 Complete
I- 55 North of I- 270 TBD Unassigned
I- 64 I- 55I- 70 to I- 255 MisterAsterix 04/19/10 Complete
I- 255 to I- 57 MisterAsterix 04/19/10 In Progress Complete from I- 255 to Exit 14
I- 70 East of I- 270 TBD Unassigned
I- 255 JB Bridge to I- 64 MisterAsterix 04/19/10 Complete
I- 64 to I- 55I- 70 MisterAsterix 04/19/10 Complete
I- 55I- 70 to I- 270 MisterAsterix 04/19/10 Complete.
IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 270 North to Wood River exit. Needs locking.
I- 270 River to I- 255IL- 255 MisterAsterix 04/19/10 Complete
I- 255IL- 255 to I- 55I- 70: Complete. MisterAsterix 04/19/10 Complete


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 TBD 04/19/10 Assigned ...


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned See Illinois Freeways


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 04/19/10 Complete Complete though some experimenting going on to make driving instructions clearer.