To Do - St. Louis, MO Discussion View history

Revision as of 16:52, 22 April 2010 by Misterasterix (talk | contribs)
Missouri Interstate Name Responsible Area Manager Date Started Status Comment
I- 44 MisterAsterix 04/19/10 Assigned Overpasses and exits done from I- 55 to I- 270. some done outside I -270.
I- 55 MisterAsterix 04/19/10 Assigned PSB to I- 44: Complete.

I- 44 to I- 270: Complete.

Outside I- 255: done to Arnold. Needs locking and some exit renaming

I- 64 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date. I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. I- 270 to MO River: Most exits & overpasses complete. Needs locking. MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to I- 170: Complete.

I- 170 to I- 270: Most exits done. Needs locking.

I- 270 to MO River: Most exits done. Needs locking.

MO River to MO- 370: Some exits done.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete. I- 70 to I- 64: Complete. I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking. I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.


Illinois Interstate Name Responsible Area Manager Date Started Status Comment
I- 55/70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Assigned ...
I- 64 MisterAsterix 04/19/10 Assigned Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches.
I- 70 MisterAsterix 04/19/10 Assigned Just started
I- 255 MisterAsterix 04/19/10 Assigned Overpasses complete. Exits 90% Complete. Locking has started
I- 270 MisterAsterix 04/19/10 Assigned Overpasses complete. Some Exits need naming. Locking has started near river.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 in IL TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 MisterAsterix 04/19/10 Assigned ...
MO- 364 MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 00/00/10 Complete Complete though some experimenting going on to make driving instructions clearer.