Freeway Name
|
Responsible Area Manager
|
Date Started
|
Status
|
Comment
|
I- 44 |
MisterAsterix |
04/19/10 |
Assigned |
Overpasses and exits done from I- 55 to I- 270. some done outside I -270.
|
I- 55 in IL |
TBD |
04/19/10 |
Assigned |
...
|
I- 55 in MO |
MisterAsterix |
04/19/10 |
Assigned |
Exits and intersections done from River to Arnold. Needs locking and some exit renaming
|
I- 55/70 |
MisterAsterix |
04/19/10 |
Assigned |
All exits and overpasses done. Locking started.
|
I- 64 in IL |
MisterAsterix |
04/19/10 |
Assigned |
Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches.
|
I- 64 in MO |
MisterAsterix |
04/19/10 |
Assigned |
All of the exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. Older stretch from from the river to Kingshighway is named but parts need locking
|
I- 70 |
MisterAsterix |
04/19/10 |
Assigned |
All overpasses done from the river to I- 270. Some exits need naming.
|
I- 170 |
MisterAsterix |
04/19/10 |
Assigned |
Exits and overpasses complete. Locking started.
|
I- 270 in MO |
MisterAsterix |
04/19/10 |
Assigned |
Entire stretch hwy gone over at least once. Locking begun in North county
|
I- 270 in IL |
MisterAsterix |
04/19/10 |
Assigned |
Overpasses complete. Some Exits need naming. Locking has started near river.
|