New Jersey/To do/Main: Difference between revisions Discussion View history

(Initial page creation from preload)
 
No edit summary
Line 16: Line 16:
* Ensure that any roads crossing at the same elevation level have a junction node connecting them.
* Ensure that any roads crossing at the same elevation level have a junction node connecting them.


See [[{{BasePage2}}/To do]] for a list of editing projects in {{RootPage2}} State, and to track and update their statuses.
===FC UPGRADE===
 
* Update the road network "Street Types" to match FC, for more information see [[#FC Upgrade|FC update info]]
* Use this [https://docs.google.com/spreadsheets/d/1hDmh2uUcDEqYFmoGHVS2nbOrPJp50mYMdIAEw0W82UA/edit#gid=0 Doc] to track completion.
<!---- DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ----
<!---- DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ----
-------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------

Revision as of 07:39, 26 August 2014


If you have any additions, updates, corrections, or suggestions for this page, feel free to edit it yourself, or send a PM to one of the RCs or SMs listed below.

Thank you, and Happy Wazing!


General Maintenance

Primary issues for maintaining the road network

  • Remove unneeded junction nodes (those not at intersections, or separating segments with different properties, i.e. city-name, street name, elevation, allowed U-turns, or splitting a segment which is over 10km long).
  • Remove excess geometry nodes (those which are not changing the geometry of a segment). When the geometry node is very near the end of a segmsegment double check while zoomed-in to see if the geometry node is actually changing the turn angle.
  • Inspect and correct connectivity of necessary junctions.
  • Update all segment "Street Names" in accordance with the guidelines in the Road Names (USA) wiki article, and the New Jersey State specific guidelines.
  • Inspect and correct overpasses/underpasses to ensure that the segments are on different levels, and do not have a junction node where they meet.
  • Ensure that any roads crossing at the same elevation level have a junction node connecting them.

FC UPGRADE

  • Update the road network "Street Types" to match FC, for more information see FC update info
  • Use this Doc to track completion.