Kentsmith9 (talk | contribs) m (Kentsmith9 moved page Connecticut/Construction to Connecticut/Closures: better name match) |
(→Montville: Oakdale Rd Bridge Closure) |
||
Line 290: | Line 290: | ||
! scope="col" width="500" bgcolor="wheat"| Notes | ! scope="col" width="500" bgcolor="wheat"| Notes | ||
! scope="col" width="100" bgcolor="wheat"| Link | ! scope="col" width="100" bgcolor="wheat"| Link | ||
|- align="center | |- align="center" | ||
| [https://www.waze.com/editor/?zoom= | | [https://www.waze.com/editor/?zoom=8&lat=41.50205&lon=-72.12262&layers=BTTFTTTTTTTTTTTTTTTTFT&segments=69065802 '''Montville Rd''']<br/>b/w Salen Tpke & Leffingwell Rd || 11/1/2012<br/>(AndyPoms) || Unplanned || '''BRIDGE OUT'''<br/>AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out." || User Report | ||
|- | |- | ||
|- align="center" | |- align="center" | ||
| [https://www.waze.com/editor/? | | [https://www.waze.com/editor/?env=usa&lon=-72.16394&lat=41.47331&layers=261&zoom=7&segments=81021872 '''Oakdale Rd''']<br/>b/w Fellows Rd & Simpson Ln || 2014-05-14<br/>(pumrum) || Oct 2014 || '''BRIDGE OUT''' || [http://www.theday.com/article/20140514/NWS01/140519860/1069/rss Closure Notice]<br>[http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=543974 DOT Notice] | ||
|- | |- | ||
|} | |} |
Revision as of 14:00, 8 August 2014
Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Road closures before making changes to the map and this page.
Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.
Major Events
These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.
What | When | Where | Link | Status |
---|---|---|---|---|
Riverwalk | Yearly July 4th Wknd |
Hartford E Hartford |
Closures | 2014 - Submitted (pumrum) |
Hartford Marathon | Yearly 2nd Sat in Oct |
Hartford E/W Hartford |
Closures | 2014 - In Progress (pumrum) |
First Night Hartford | Yearly New Years Eve |
Hartford | Event Site | 2014 - Not Yet Submitted |
Minor Events
These are Minor Events that are submitted to via the closure sheet on a regular basis, typically yearly.
What | When | Where | Link | Status |
---|---|---|---|---|
Riverwalk | Yearly July 4th Wknd |
Hartford E Hartford |
Closures | 2014 - Submitted (pumrum) |
Hartford Marathon | Yearly 2nd Sat in Oct |
Hartford E/W Hartford |
Closures | 2014 - In Progress (pumrum) |
First Night Hartford | Yearly New Years Eve |
Hartford | Event Site | 2014 - Not Yet Submitted |
Bethel
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Walnut Hill Rd near Taylor Rd |
4/1/2013 (CTGreybeard) |
6/11/2014 (CTGreybeard) |
REOPENED |
Town of Bethel |
Branford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-95 N & S |
6/28/2012 (AndyPoms) |
NB:10/3/2013 (AndyPoms) SB:Closed |
SERVICE PLAZA CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Bridgeport
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Grant St b/w Central & Mill Hill |
6/28/2012 (AndyPoms) |
Unknown | PERMANENT CLOSURE Creation of Grant St Plaza - pedestrain area in front of Bridgeport Hospital. Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic). |
City of Bridgeport |
South Ave Under Amtrak |
7/26/2013 (CTGreybeard) |
1/1/2014 | Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B | Connecticut Master Transportation Plan (search for the project number) |
Chester
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Water St b/w N Main St & E Liberty St |
11/9/2012 (AndyPoms) |
12/24/2012 (AndyPoms)) |
REOPENED Description |
Town of Chester |
Cornwall
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Cornwall Hollow Rd btwn Johnson and Lake |
2014-08-28 0900 (pumrum) |
2014-09-24 1500 (pumrum) |
Added to Closure List | CT-DOT Project 0031-0128 |
Darien
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-95 N & S |
3/22/2012 (AndyPoms) |
NB:6/6/2013 (AndyPoms) |
SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Fairfield
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
5/7/2012 (Jallen) |
NB:12/12/12 (AndyPoms) SB:2/1/13 (AndyPoms) |
REOPENED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Service Plaza I-95 N & S |
NB:7/18/2013 (AndyPoms) SB:9/26/2103 (AndyPoms) |
Unknown | SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Cornell Rd b/w Westbrook Pl & White Oak Rd |
10/12/2012 (AndyPoms) |
7/28/2013 CTGreybeard |
REOPENED Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. NOTE: AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again. |
Town of Fairfield |
Merritt St at Valley Rd |
11/27/2012 (AndyPoms) |
7/28/2013 CTGreybeard |
REOPENED Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area. |
Town of Fairfield |
Westway Rd across Amtrak |
7/29/2013 (CTGreybeard) |
4/15/2014 (AndyPoms - UR) |
REOPENED UPDATE 3/18/13- Westway Road between Pequot Avenue and Westford Drive in the Southport section of Fairfield. DETOUR INFO-Traffic will be detoured along Pequot Avenue, Old Post Road, Route 1 (Post Road), Kings Highway West and Oxford Road. Westway Road on either side of the railroad bridge will be open for local traffic only. Project #0301-0070 A |
Connecticut DOT (search on project number) |
Greenwich
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
2/1/2013 (AndyPoms) |
Unknown | SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
John St b/w Riversville Rd & Buckfield Ln |
8/16/2013 (AndyPoms) |
10/3/2013 (AndyPoms) |
REOPENED Bridge Replacement Project Construction stared June 25, 2013 |
Town of Greenwich |
Lockwood Ln b/w E Putnam Ave & Leonard Ave |
6/1/2013 (AndyPoms) |
11/28/2013 (AndyPoms) |
REOPENED Bridge Replacement Project Construction stared April 1, 2013 |
Town of Greenwich |
Griswold
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Edmond Rd b/w Hopeville Rd & Dudek Rd |
3/29/2013 (AndyPoms) |
1/30/2014 (AndyPoms - MP) |
BRIDGE REPLACEMENT The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road. |
Town of Griswold |
Hamden
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Tuttle Ave b/w Dunn Rd & River Rd |
12/4/2012 (AndyPoms) |
7/19/2013 (AndyPoms) |
REOPENED Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant. At this time they do not promise, but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring." |
Town of Hamden |
Hartford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Elliott St E b/w Wethersfield & Ledyard St |
10/14/2012 (AndyPoms) |
11/12/2012 (AndyPoms) |
REOPENED MDC Sewer Separation Project |
MDC |
Flower St b/w Farmington & Capital |
11/27/2012 (AndyPoms) |
PERMANENT CLOSURE | ROAD PERMANENTLY CLOSED Busway Construction Closure Starts 12/3/2012 |
CT fastrak |
Granby St b/w Tower & Ledyard |
10/14/2012 (AndyPoms) |
Unknown | ROAD CLOSED MDC Sewer Separation Project |
MDC |
Jewell St b/w Ann Uccello St and Trumbull St |
Approx 7/14/2014 (ploben) |
Unknown | WESTBOUND TRAFFIC CLOSED | First Hand |
Sigourney St. b/w Homestead & Sargent |
4/1/2012 (AndyPoms) |
6/13/2013 (AndyPoms) |
REOPENED Bridge Replacement |
ConnDOT |
*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.
Killingly
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
River Rd b/w Mason Hill Rd & Cutler Rd |
10/26/2012 (AndyPoms) |
11/3/2012 (AndyPoms) |
REOPENED Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening. UPDATE 11/3/2012: According to Town Manager, There are two bridges on River Road in Killingly. Both bridges were closed to traffic in April 2011 due to storm damage. Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...) |
Town of Killingly |
Madison
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-95 N & S |
NB:10/3/2013 (AndyPoms) SB:TBA |
UNKNOWN | SERVICE PLAZA CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Manchester
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Edgarton St btwn Lodge Dr & Edgarton St |
01/01/2010 (ploben) |
Unplanned (ploben) |
Sinkhole | Article |
Meriden
Middletown
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Arrigoni Br b/w Middletown & Portland |
5/1/2011 (AndyPoms) |
Anticipated 11/7/2012 |
ONE LANE EACH DIRECTION Bridge Replacement No Closures-traffic pattern changes. Silver St b/w Brownstone and Main-One Way Westbound. |
ConnDOT |
Montville
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Montville Rd b/w Salen Tpke & Leffingwell Rd |
11/1/2012 (AndyPoms) |
Unplanned | BRIDGE OUT AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out." |
User Report |
Oakdale Rd b/w Fellows Rd & Simpson Ln |
2014-05-14 (pumrum) |
Oct 2014 | BRIDGE OUT | Closure Notice DOT Notice |
Naugatuck
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
CT-8S Ramp On Ramp at Exit 28 |
7/9/2013 (AndyPoms) |
11/25/2013 (AndyPoms) |
REOPENED The ramp closure is required for construction of retaining walls and fencing necessary for the completion of the Pedestrian Greenway along the Naugatuck River. |
Naugatuck |
New Britain
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Long Swamp Rd b/w Slater Rd & Alton Brooks Way |
11/17/2012 (AndyPoms) |
Unknown | ROAD CLOSED UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way." AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not. |
User Report |
New Canaan
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Mariomi Rd b/w Valley Rd & Thayer Pond Rd |
2/15/2013 (AndyPoms) |
6/11/2013 (AndyPoms) |
REOPENED Started May, 2012, reported by user Feb, 2013. Project anticipated to last 1 year. |
Town of New Canaan |
New Haven
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
E Rock Rd. b/w Livingston & Farnum |
6/14/2013 (AndyPoms) |
Unknown | ROAD CLOSED Bridge Replacement |
E Rock Brg |
CT-34 At Exit 2 |
5/1/2013 (AndyPoms) |
PERMANENT CLOSURE | ROAD PERMANENTLY CLOSED Downtown Crossing Project Closure Starts 5/2/2013 |
City of New Haven |
State St. b/w Lawrence & James |
10/12/2010 (AndyPoms) |
Anticipated Unknown |
ROAD CLOSED Bridge Replacement (CT DOT Project #0092-0561) |
ConnDOT |
Trumbull St. b/w Orange & Whitney |
11/28/2011 (AndyPoms) |
3/12/2013 (AndyPoms) |
REOPENED TWO WAY Sewer Separation Project |
City of New Haven |
I-95 b/w Exit 46 & Exit 54 |
June 2002 |
Anticipated Fall 2016 |
MAJOR PROJECT Expect Lane & Road & Ramp Closures at all times (mostly overnight) |
I-95 New Haven |
Yale Ave b/w Derby & Chapel |
7/30/2012 (AndyPoms) |
8/30/2012 (AndyPoms) |
REOPENED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Newtown
Norwalk
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Fairfield Ave b/w Connecticut Ave (US-1) & Reed St Ext |
12/5/2013 (AndyPoms) |
Winter 2014 | ROAD CLOSED Bridge Replacement Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. |
ConnDOT |
Taylor Ave b/w Connecticut Ave (US-1) & Church St |
12/5/2013 (AndyPoms) |
Winter 2014 | ROAD CLOSED Bridge Replacement Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. |
ConnDOT |
Cedar St. b/w Connecticut Ave (US-1) & Summit Ave |
8/21/2012 (AndyPoms) |
11/22/2013 (AndyPoms/UR) |
REOPENED Bridge Replacement |
ConnDOT |
Triangle St. b/w Norden Plaza & Howard Ave |
7/29/2012 (AndyPoms) |
6/17/2013 (CTGreyBeard) |
REOPENED Bridge Replacement |
ConnDOT |
Rampart Rd b/w Connecticut Ave & Jomar Rd |
2/10/2012 (Jallen) |
8/13/2012 (jeberhard) |
REOPENED Bridge Replacement |
ConnDOT |
Orange
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
2/1/2013 (AndyPoms) |
Unknown | SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Plainfield
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-395 N & S |
6/21/2012 (AndyPoms) |
10/22/2012 (AndyPoms) |
REPOPENED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Plainville
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Stillwell Dr b/w Linsley Dr & Rosemont Dr |
7/21/2013 (AndyPoms) |
2/22/2014 (AndyPoms) |
BRIDGE REPLACEMENT Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River. |
Plainville |
Redding
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Simpaug Tpke b/w Marchant Rd & Picketts Ridge Rd |
10/10/2011 (Jallen) |
Anticipated 12/6/2012 |
Bridge Replacement Replacement of the bridge over the Metro-North Railroad |
Rockville
Stamford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Edison Rd b/w Merrell Ave & Stamford Hospital |
11/17/2012 (AndyPoms) |
Unknown | ROAD CLOSED UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project |
Stamford Hospital |
Trumbull
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Madison Ave b/w Plattsville Rd & Hitching Post Ln |
7/9/2012 (AndyPoms) |
9/28/2012 (AndyPoms) |
REOPENED Bridge Replacement |
ConnDOT |
Westport
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
North Ave at Coleytown Rd |
3/29/2013 (AndyPoms) |
Approx 4/14/2013 |
BRIDGE REPLACEMENT Road Closed north of Coleytown Rd to complete bridge reconstruction. |
Town of Westport |
Ketchum St b/w Riverside Ave & #7 Ketchum |
2/8/2013 (AndyPoms) |
Approx 4/14/2013 |
ROAD CLOSED Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12 |
Town of Westport |
Wolcott
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Center St at Woodtick Rd |
6/27/2013 (CTGreybeard) |
9/29/2013 (AndyPoms/UR) |
ROAD CLOSED Road Construction at the intersection of Center Street and Woodtick Road See link at right. |
Town of Wolcott |
Annual Closures
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Yale Ave b/w Derby & Chapel |
Approx 8/1/20XX (USER) |
Approx 9/7/20XX (USER) |
ROAD CLOSED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Template
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
<ROAD NAME> b/w <CROSS STREETS> |
Approx 1/1/20XX (<USER>) |
Approx 9/7/20XX (<USER>) |
ROAD CLOSED Description |
<LINK> |