(Importing a new version from external source) |
(Importing a new version from external source) |
||
Line 1: | Line 1: | ||
Also, in urban areas that are mostly under construction, try to make stubs to the roads: making a short low-level segment for each exit that a low-level editor can attach to. If you need to edit a road above your lock level, ask an unlock | Also, in urban areas that are mostly under construction, try to make stubs to the roads: making a short low-level segment for each exit that a low-level editor can attach to. If you need to edit a road above your lock level, [https://www.waze.com/forum/viewtopic.php?f=667&t=42103 ask an unlock] or ask a higher level editor in one of the [[Turkey#Communication|communication platforms]] to do the edit for you. |
Revision as of 18:58, 6 July 2017
Also, in urban areas that are mostly under construction, try to make stubs to the roads: making a short low-level segment for each exit that a low-level editor can attach to. If you need to edit a road above your lock level, ask an unlock or ask a higher level editor in one of the communication platforms to do the edit for you.