Arizona/To do: Difference between revisions Discussion View history

(→‎Construction: fixed link)
(→‎General Maintenance: Removed deleting Uturns)
 
Line 9: Line 9:
'''''Primary issues for maintaining the road network'''''
'''''Primary issues for maintaining the road network'''''
* Remove unneeded junction nodes.
* Remove unneeded junction nodes.
* Disable all U-Turns at junction nodes (when applicable). Do this by pressing 'Q'.
* Remove excess geometry nodes (those which are '''not''' changing the geometry of a segment). When the geometry node is very near the end of a segment, double check while zoomed-in to see if the geometry node is actually changing the turn angle.
* Remove excess geometry nodes (those which are '''not''' changing the geometry of a segment). When the geometry node is very near the end of a segment, double check while zoomed-in to see if the geometry node is actually changing the turn angle.
* Inspect and correct connectivity of necessary junctions.
* Inspect and correct connectivity of necessary junctions.
Line 17: Line 16:
* Ensure that any roads crossing at the same elevation level have a junction node connecting them.
* Ensure that any roads crossing at the same elevation level have a junction node connecting them.
* Ensure that Update Requests are being handled correctly, courteously and in a timely fashion.
* Ensure that Update Requests are being handled correctly, courteously and in a timely fashion.


==Construction==
==Construction==


[[Arizona/Closures]]
[[Arizona/Closures]]

Latest revision as of 22:22, 17 July 2015

Welcome Arizona Wazers! This is the Arizona To Do List Page. Want to help out with the map in Arizona? Please see Map Editing & Editing Best Practices for a starting point on how to edit the map.


If you have any additions, updates, corrections, or suggestions for this page, feel free to edit it yourself, post on the state forum, or send a PM to one of the RCs or SMs listed below.

Thank you, and Happy Wazing!

General Maintenance

Primary issues for maintaining the road network

  • Remove unneeded junction nodes.
  • Remove excess geometry nodes (those which are not changing the geometry of a segment). When the geometry node is very near the end of a segment, double check while zoomed-in to see if the geometry node is actually changing the turn angle.
  • Inspect and correct connectivity of necessary junctions.
    • Ensure there is no connectivity of non-drivable segments to drivable ones.
  • Update all segment "Street Names" in accordance with the guidelines in the Road Names (USA) wiki article, and the Arizona State specific guidelines.
  • Inspect and correct overpasses/underpasses to ensure that the segments are on different levels, and do not have a junction node where they meet.
  • Ensure that any roads crossing at the same elevation level have a junction node connecting them.
  • Ensure that Update Requests are being handled correctly, courteously and in a timely fashion.

Construction