< Oklahoma
Okladriver (talk | contribs) m (Added okladriver's list) |
Okladriver (talk | contribs) |
||
Line 7: | Line 7: | ||
* Add additional names to I-44 through through town from the Creek Turnpike interchange on the Northeast end of town. | * Add additional names to I-44 through through town from the Creek Turnpike interchange on the Northeast end of town. | ||
===== okladriver - Things to keep checking on ===== | ===== okladriver - Things to keep checking on ===== | ||
* I-40 and Shields ramps - possible closures | * I-40 and Shields ramps - possible closures - Closures in place on Shields / EKG. | ||
* Norman - new construction between Robinson and Tecumseh | * Norman - I-35 / Lindsey / HWY 9 Reconstruction: | ||
* Moore - Telephone Rd closure | ** Lindsey to become SPUI | ||
** HWY 9 to have new leaf and connectors | |||
* Norman - new construction between Robinson and Tecumseh - Monitoring and updating. | |||
* Moore - Telephone Rd closure - In place, need to monitor for re-opening or delay. |
Revision as of 21:14, 19 May 2015
dBsooner - Things to keep checking on
- Construction on Memorial between Admiral and 12th
- New Neighborhood at 126th and Sheridan - Seven Lakes III and IV - Road Names and geometry
- New Neighborhood at S 33rd W Ave and Creek Turnpike - Road Names and Geometry (Far Southeast)
- Add additional names to I-44 through through town from the Creek Turnpike interchange on the Northeast end of town.
okladriver - Things to keep checking on
- I-40 and Shields ramps - possible closures - Closures in place on Shields / EKG.
- Norman - I-35 / Lindsey / HWY 9 Reconstruction:
- Lindsey to become SPUI
- HWY 9 to have new leaf and connectors
- Norman - new construction between Robinson and Tecumseh - Monitoring and updating.
- Moore - Telephone Rd closure - In place, need to monitor for re-opening or delay.