Connecticut/Closures: Difference between revisions Discussion View history

Line 43: Line 43:
|-
|-
|- align="center" bgcolor="#ffff00"
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under I-95 & Amtrak || 7/26/2013<br/>(CTGreybeard) || Unknown || '''Unknown Construction''' || Researching documentation
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under Amtrak || 7/26/2013<br/>(CTGreybeard) || Unknown || '''Unknown Construction''' || Researching documentation
|-
|-
|}
|}

Revision as of 03:19, 27 July 2013

Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page.

Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.

On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([1]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).

Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.

Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.

Bethel

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Walnut Hill Rd
near Taylor Rd
4/1/2013
(CTGreybeard)
Anticipated
9/18/2013
BRIDGE CLOSED
Rebuild aging bridge over Limekiln Brook on Walnut Hill Rd.
Town of Bethel

Branford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
6/28/2012
(AndyPoms)
Unknown SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Bridgeport

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Grant St
b/w Central & Mill Hill
6/28/2012
(AndyPoms)
Unknown PERMANENT CLOSURE
Creation of Grant St Plaza - pedestrain area in front of Bridgeport Hospital. Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic).
City of Bridgeport
South Ave
Under Amtrak
7/26/2013
(CTGreybeard)
Unknown Unknown Construction Researching documentation

Chester

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Water St
b/w N Main St & E Liberty St
11/9/2012
(AndyPoms)
12/24/2012
(AndyPoms))
REOPENED
BRIDGE REPLACEMENT
Description
Town of Chester

Darien

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
3/22/2012
(AndyPoms)
NB:6/6/2013
(AndyPoms)
SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Fairfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
5/7/2012
(Jallen)
NB:12/12/12 (AndyPoms)
SB:2/1/13 (AndyPoms)
REOPENED
SERVICE PLAZAS CLOSED

Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Service Plaza
I-95 N & S
NB:7/18/2013
(AndyPoms)
NB:Open
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Cornell Rd
b/w Westbrook Pl & White Oak Rd
10/12/2012
(AndyPoms)
Anticipated
12/2012-1/2013
BRIDGE REPLACEMENT
REOPENED
BRIDGE REPLACEMENT
Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. NOTE: AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again.
Town of Fairfield
Merritt St
at Valley Rd
11/27/2012
(AndyPoms)
Anticipated
7/2013
BRIDGE REPLACEMENT
Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area.
Town of Fairfield

Greenwich

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Lockwood Ln
b/w E Putnam Ave & Leonard Ave
6/1/2013
(AndyPoms)
Anticipated
11/30/2013
Bridge Replacement Project
Construction stared April 1, 2013
Town of Greenwich

Griswold

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edmond Rd
b/w Hopeville Rd & Dudek Rd
3/29/2013
(AndyPoms)
Anticipated
11/2013
BRIDGE REPLACEMENT
The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road.
Town of Griswold

Hamden

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Tuttle Ave
b/w Dunn Rd & River Rd
12/4/2012
(AndyPoms)
7/19/2013
(AndyPoms)
REOPENED
BRIDGE REPLACEMENT
Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant. At this time they do not promise, but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring."
Town of Hamden

Hartford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Elliott St E
b/w Wethersfield & Ledyard St
10/14/2012
(AndyPoms)
11/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED

MDC Sewer Separation Project
MDC
Flower St
b/w Farmington & Capital
11/27/2012
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Busway Construction
Closure Starts 12/3/2012
CT fastrak
Granby St
b/w Tower & Ledyard
10/14/2012
(AndyPoms)
Unknown ROAD CLOSED
MDC Sewer Separation Project
MDC
Sigourney St.
b/w Homestead & Sargent
4/1/2012
(AndyPoms)
6/13/2013
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.

Killingly

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
River Rd
b/w Mason Hill Rd & Cutler Rd
10/26/2012
(AndyPoms)
11/3/2012
(AndyPoms)
REOPENED
BRIDGE REPLACEMENT
Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening.
UPDATE 11/3/2012: According to Town Manager, There are two bridges on River Road in Killingly. Both bridges were closed to traffic in April 2011 due to storm damage. Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...)
Town of Killingly

Meriden

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cook Ave
b/w Summer St & Meridian St
10/10/2012
(AndyPoms)
12/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
CT DOT Project 79-215.
ConnDOT

Middletown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Arrigoni Br
b/w Middletown & Portland
5/1/2011
(AndyPoms)
Anticipated
11/7/2012
ONE LANE EACH DIRECTION
Bridge Replacement
No Closures-traffic pattern changes.
Silver St b/w Brownstone and Main-One Way Westbound.
ConnDOT

Montville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-395 S
10/22/2012
(AndyPoms)
Unknown SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Montville Rd
b/w Salen Tpke & Leffingwell Rd
11/1/2012
(AndyPoms)
Unplanned BRIDGE OUT
AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out."
User Report

Naugatuck

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
CT-8S Ramp
On Ramp at Exit 28
7/9/2013
(AndyPoms)
Approx
9/16/2013
RAMP CLOSED
The ramp closure is required for construction of retaining walls and fencing necessary for the completion of the Pedestrian Greenway along the Naugatuck River.
Naugatuck

New Britain

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Long Swamp Rd
b/w Slater Rd & Alton Brooks Way
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way."

AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not.
User Report

New Canaan

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Mariomi Rd
b/w Valley Rd & Thayer Pond Rd
2/15/2013
(AndyPoms)
6/11/2013
(AndyPoms)
REOPENED
BRIDGE REPLACEMENT
Started May, 2012, reported by user Feb, 2013. Project anticipated to last 1 year.
Town of New Canaan

New Haven

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
E Rock Rd.
b/w Livingston & Farnum
6/14/2013
(AndyPoms)
Unknown ROAD CLOSED
Bridge Replacement
E Rock Brg
CT-34
At Exit 2
5/1/2013
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Downtown Crossing Project
Closure Starts 5/2/2013
City of New Haven
State St.
b/w Lawrence & James
10/12/2010
(AndyPoms)
Anticipated
10/2011
2/2012
4/30/2013
ROAD CLOSED
Bridge Replacement (CT DOT Project #0092-0561)
ConnDOT
Trumbull St.
b/w Orange & Whitney
11/28/2011
(AndyPoms)
3/12/2013
(AndyPoms)
REOPENED TWO WAY
ONE WAY (WESTBOUND)
Sewer Separation Project
City of New Haven
I-95
b/w Exit 46 & Exit 54
June 2002
Anticipated
Fall 2016
MAJOR PROJECT
Expect Lane & Road & Ramp Closures at all times (mostly overnight)
I-95 New Haven
Yale Ave
b/w Derby & Chapel
7/30/2012
(AndyPoms)
8/30/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Newtown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
b/w Underhill Rd & Lake Dr
7/15/2013
(AndyPoms)
Approx
8/2/2013
ROAD CLOSED
for overhead bridge rehibilitation
ConnDOT

Norwalk

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cedar St.
b/w Connecticut Ave (US-1) & Summit Ave
8/21/2012
(AndyPoms)
Anticipated
11/2013
ROAD CLOSED
Bridge Replacement
ConnDOT
Triangle St.
b/w Norden Plaza & Howard Ave
7/29/2012
(AndyPoms)
6/17/2013
(CTGreyBeard)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT
Rampart Rd
b/w Connecticut Ave & Jomar Rd
2/10/2012
(Jallen)
8/13/2012
(jeberhard)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

Orange

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Plainfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-395 N & S
6/21/2012
(AndyPoms)
10/22/2012
(AndyPoms)
REPOPENED
SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Plainville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Stillwell Dr
b/w Linsley Dr & Rosemont Dr
7/21/2013
(AndyPoms)
Anticipated
September 2013
BRIDGE REPLACEMENT
Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River.
Plainville

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Simpaug Tpke
b/w Marchant Rd & Picketts Ridge Rd
10/10/2011
(Jallen)
Anticipated
June 2012
10/29/2012
12/6/2012
Bridge Replacement
Replacement of the bridge over the Metro-North Railroad

Stamford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edison Rd
b/w Merrell Ave & Stamford Hospital
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project
Stamford Hospital

Trumbull

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Madison Ave
b/w Plattsville Rd & Hitching Post Ln
7/9/2012
(AndyPoms)
9/28/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

Westport

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
North Ave
at Coleytown Rd
3/29/2013
(AndyPoms)
Approx
4/14/2013
BRIDGE REPLACEMENT
Road Closed north of Coleytown Rd to complete bridge reconstruction.
Town of Westport
Ketchum St
b/w Riverside Ave & #7 Ketchum
2/8/2013
(AndyPoms)
Approx
4/14/2013
ROAD CLOSED
Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12
Town of Westport

Wolcott

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
at Woodtick Rd
6/27/2013
(CTGreybeard)
Approx
8/22/2013
ROAD CLOSED
Road Construction at the intersection of Center Street and Woodtick Road See link at right.
Town of Wolcott

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME>
b/w <CROSS STREETS>
Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>