m (→Closures/Main) |
|||
Line 13: | Line 13: | ||
|- | |- | ||
| Old McKenzie Pass OR-242 | | Old McKenzie Pass OR-242 | ||
| | | FzNk | ||
| | | 2017-09 | ||
| | | Unknown | ||
| | | | ||
Both gates closed for the | Both gates closed due to the Milli Fire and may remain closed for the season. | ||
KEEP THE FOLLOWING FOR FUTURE REFERENCE: | KEEP THE FOLLOWING FOR FUTURE REFERENCE: | ||
Line 35: | Line 35: | ||
!width="15%"|Est Compl Date | !width="15%"|Est Compl Date | ||
!width="60%"|Links and comments | !width="60%"|Links and comments | ||
|- | |- | ||
|US-20 Pioneer Mountain to Eddyville | |US-20 Pioneer Mountain to Eddyville | ||
| | |Phase 5: 2017 | ||
Phase 5: 2017 | |||
|ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation. | |ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation. | ||
Line 61: | Line 45: | ||
[https://www.waze.com/editor/?zoom=0&lat=44.64356&lon=-123.84449&layers=BTFTFTTFTFTFTTTTT WazeMap] | [https://www.waze.com/editor/?zoom=0&lat=44.64356&lon=-123.84449&layers=BTFTFTTFTFTFTTTTT WazeMap] | ||
|- | |- | ||
|Newberg-Dundee Bypass | |Newberg-Dundee Bypass | ||
|2013- | |2013-2017 | ||
|Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction | |Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction began in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on OR219 then to S Sprinbrook RD. then to 99W. | ||
[ | [http://www.oregon.gov/odot/projects/pages/project-details.aspx?project=16901 ODOT Newberg-Dundee Bypass Project Page] | ||
|} | |} | ||
Revision as of 16:41, 18 September 2017
Road Closures
This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.
Road Name | Editor | Closed Date | Est Open Date | Links and comments |
---|---|---|---|---|
Old McKenzie Pass OR-242 | FzNk | 2017-09 | Unknown |
Both gates closed due to the Milli Fire and may remain closed for the season. KEEP THE FOLLOWING FOR FUTURE REFERENCE: Area Places for the closure gates should be large in the winter for better app visibility. Shrink the area in the summer. |
Future New or Realigned Roads
Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.
Road Or Project Name | Est Compl Date | Links and comments |
---|---|---|
US-20 Pioneer Mountain to Eddyville | Phase 5: 2017 | ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation.
The new section of US-20 opened to traffic Fall 2016. Tie-in work continues on the west end of the project. |
Newberg-Dundee Bypass | 2013-2017 | Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction began in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on OR219 then to S Sprinbrook RD. then to 99W. |