Rhode Island/Construction: Difference between revisions Discussion View history

(New page: Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of Rhode Island. Please note start and (anticipated) end dates as well as a link to...)
 
(fixing double redirection)
 
(15 intermediate revisions by 3 users not shown)
Line 1: Line 1:
Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Rhode Island]].  Please note start and (anticipated) end dates as well as a link to more information about the project (if available).  Be sure to read [[How to handle road closures]] before making changes to the map & this page.
Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Rhode Island]].  Please note start and (anticipated) end dates as well as a link to more information about the project (if available).  Be sure to read [[Real time closures | How to handle road closures]] before making changes to the map & this page.


<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>
Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week).  At this point please only map closures that are in effect for more than two weeks.


<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
== Providence ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-71.41783&lat=41.82805&layers=1925&zoom=5&segments=43537952 '''Exit 22''']<br/>I-95 S|| 10/6/2014<br/>(GooberKing) || Approx.<br>October 2015 || '''RAMP MOVED'''<br/>New temporary ramp while old ramp is replaced || [http://www.ri.gov/press/view/23036 RIDOT]
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-71.43814&lat=41.82446&layers=1925&zoom=7&segments=83427286 '''Atwells Ave''']|| 01/05/2015<br/>(GooberKing) || Approx.<br>January 2016 || '''BRIDGE CLOSED'''<br/>Bridge closed for rehabilitation || [http://www.ri.gov/press/view/23622 RIDOT]
|-
|}


Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.
== Richmond ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-71.55856&lat=41.48411&layers=1925&zoom=6&segments=65067855 '''Railroad Ave'''] || 12/23/2014<br/>(GooberKing) || Approx<br/>August 2015 || '''ROAD CLOSED'''<br/>Repair Rte 138 Overpass || [http://www.ri.gov/press/view/23634 RIDOT]
|-
|}


== Cumberland ==
== Warwick ==
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 15: Line 37:
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.97147&lon=-71.47071&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=43520888,43498273 '''Manville Hill Road''']<br/>b/w Railroad St & Flat St || 12/27/2012<br/>AndyPoms|| Work Begins<br/>Summer 2013 || '''BRIDGE REPLACEMENT'''<br/>During a bridge inspection [week of Dec 7, 2012], engineers noted steel and bridge beam deterioration significant enough to require the Department to close the bridge. || [http://www.ri.gov/press/view/18123 RI DOT]
| [https://www.waze.com/editor/?env=usa&lon=-71.37672&lat=41.71240&layers=901&zoom=5&segments=82279165,82279166 '''Tidewater Dr'''] || 9/22/2014<br/>(GooberKing) || Approx<br/>June 2015 || '''BRIDGE CLOSED'''<br/>Mill Creek Bridge Reconstruction || [http://www.warwickri.gov/index.php?option=com_content&view=article&id=1343:tidewater-drive-to-close-ripta-bus-route-will-be-altered-as-mill-creek-bridge-construction-begins&catid=197:news-archives-2014&Itemid=359 Town of Warwick]
|-
|-
|}
|}

Latest revision as of 12:43, 24 March 2015

Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow in the State of Rhode Island. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page.

Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.

Providence

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Exit 22
I-95 S
10/6/2014
(GooberKing)
Approx.
October 2015
RAMP MOVED
New temporary ramp while old ramp is replaced
RIDOT
Atwells Ave 01/05/2015
(GooberKing)
Approx.
January 2016
BRIDGE CLOSED
Bridge closed for rehabilitation
RIDOT

Richmond

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Railroad Ave 12/23/2014
(GooberKing)
Approx
August 2015
ROAD CLOSED
Repair Rte 138 Overpass
RIDOT

Warwick

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Tidewater Dr 9/22/2014
(GooberKing)
Approx
June 2015
BRIDGE CLOSED
Mill Creek Bridge Reconstruction
Town of Warwick

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME>
b/w <CROSS STREETS>
Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>