(→Putnam) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page. | Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page. | ||
<!-- | <!-- <del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del> | ||
<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del> | |||
<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del> | <del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del> | ||
Line 56: | Line 55: | ||
|} | |} | ||
== | ==Danbury== | ||
{| | {| class="sortable mw-collapsible" border="1" width="100%" | ||
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ||
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ||
Line 88: | Line 62: | ||
! scope="col" width="500" bgcolor="wheat" |Notes | ! scope="col" width="500" bgcolor="wheat" |Notes | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.42195&lat=41.40524&s=120952083&zoom=8&segments=511450068 '''Old Newtown Rd'''] | ||
|Approx<br />9/8/20<br />(Jallen) | |||
|Approx<br />11/6/20<br />(Jallen) | |||
|'''ROAD CLOSED'''<br />Intersection and safety improvements | |||
|[https://www.dropbox.com/sh/zvkigvewg85lyfz/AACfCj9WwE9O-x0hskaSV-G1a?dl=0 BOTG Pics] | |||
[https://portal.ct.gov/DOT/Construction-News-from-the-Connecticut-Department-of-Transportation/2020/Intersection-and-Safety-Improvements-on-SR-806-Newtown-Road-in-Danbury DOT Info] | [https://portal.ct.gov/DOT/Construction-News-from-the-Connecticut-Department-of-Transportation/2020/Intersection-and-Safety-Improvements-on-SR-806-Newtown-Road-in-Danbury DOT Info] | ||
|- | |- | ||
|} | |} | ||
==Putnam== | ==Putnam== | ||
{| class="sortable mw-collapsible" border="1" width="100%" | |||
{| | |||
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ||
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ||
Line 361: | Line 79: | ||
! scope="col" width="500" bgcolor="wheat" |Notes | ! scope="col" width="500" bgcolor="wheat" |Notes | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
|[https://www.waze.com/editor/ '''Modock Rd'''] | |[https://www.waze.com/editor/ '''Modock Rd'''] | ||
Line 369: | Line 85: | ||
|'''ROAD CLOSED'''<br />Air Trail Construciton | |'''ROAD CLOSED'''<br />Air Trail Construciton | ||
|[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>] | |[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>] | ||
|- | |||
|[Https://www.waze.com/en-US/editor%3Fenv%3Dusa%26lon%3D-71.91396%26lat%3D41.88964%26s%3D3342204415%26zoom%3D8%26segments%3D85236239 '''River Rd'''] | |||
|Approx<br />10/16/20<br />(harrypotter418) | |||
|Approx<br />12/31/20<br />(harrypotter418) | |||
|'''ROAD CLOSED'''<br />Excavation & installation of tunnel | |||
|[https://www.putnamct.us/sites/g/files/vyhlif3711/f/minutes/trails_committee_meeting_minutes_august_27_2019.pdf Trails Committe Info] | |||
|- | |- | ||
|} | |} | ||
Line 386: | Line 108: | ||
|[https://www.constructionjournal.com/projects/details/f43ae094acb14a889ece8d605f06fc12.html Const Journal] | |[https://www.constructionjournal.com/projects/details/f43ae094acb14a889ece8d605f06fc12.html Const Journal] | ||
[https://www.facebook.com/ReddingCT/posts/station-road-will-be-closed-for-the-bridge-replacement-project-starting-monday-s/3333308350080944/ Redding FB] | [https://www.facebook.com/ReddingCT/posts/station-road-will-be-closed-for-the-bridge-replacement-project-starting-monday-s/3333308350080944/ Redding FB] | ||
|- | |- | ||
|} | |} | ||
Line 429: | Line 120: | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.04739&lat=41.55059&s=53843219&zoom=6&segments=70584266 '''Exit 19 Off-Ramp''' (I-84 Westbound to Route 8 Southbound)] | ||
|Approx<br />10/18/20<br />(Jallen) | |Approx<br />10/18/20<br />(Jallen) | ||
|Approx<br />10/24/20<br />(Jallen) | |Approx<br />10/24/20<br />(Jallen) | ||
Line 435: | Line 126: | ||
|[https://mixmaster-rehab.com/the-project/about-the-project DOT] | |[https://mixmaster-rehab.com/the-project/about-the-project DOT] | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.04377&lat=41.55199&s=53843219&zoom=7&segments=61698396 '''Bank Street On-Ramp''' (I-84 Westbound to Route 8 Southbound)] | ||
|Approx<br />10/18/20<br />(Jallen) | |Approx<br />10/18/20<br />(Jallen) | ||
|Approx<br />10/24/20<br />(Jallen) | |Approx<br />10/24/20<br />(Jallen) | ||
Line 441: | Line 132: | ||
|[https://mixmaster-rehab.com/the-project/about-the-project DOT] | |[https://mixmaster-rehab.com/the-project/about-the-project DOT] | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.05063&lat=41.55065&s=53843219&zoom=6&segments=61698556,518497101 '''Exit 33 Ramp''' (SR-8 NB to I-84 WB)] | ||
|Approx<br />9/25/20<br />(Jallen) | |Approx<br />9/25/20<br />(Jallen) | ||
|Approx<br />1/3/21<br />(Jallen) | |Approx<br />1/3/21<br />(Jallen) | ||
|'''ROAD CLOSED'''<br />Mixmaster construction | |'''ROAD CLOSED'''<br />Mixmaster construction | ||
|[https://mixmaster-rehab.com/the-project/about-the-project DOT] | |[https://mixmaster-rehab.com/the-project/about-the-project DOT] | ||
|- | |- | ||
|} | |} | ||
Line 467: | Line 142: | ||
==Template== | ==Template== | ||
This is the template for the tables in this page. | This is the template for the tables in this page. | ||
{| border="1" width="100%" | {| class="sortable mw-collapsible" border="1" width="100%" | ||
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets | ||
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username) | ||
Line 473: | Line 148: | ||
! scope="col" width="500" bgcolor="wheat" |Notes | ! scope="col" width="500" bgcolor="wheat" |Notes | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
|[https://www.waze.com/editor/ '''<ROAD NAME>'''] | |[https://www.waze.com/editor/ '''<ROAD NAME>'''] | ||
|Approx<br />1/1/20XX<br />(<USER>) | |||
|Approx<br />9/7/20XX<br />(<USER>) | |||
|'''ROAD CLOSED'''<br />Description | |||
|[http://www.waze.com/ <LINK>] | |||
|- | |- | ||
|} | |} |
Latest revision as of 19:45, 19 October 2020
Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.
Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.
Major Events
Minor Events
These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.
What | When | Where | Link | Status |
---|---|---|---|---|
Riverwalk | Yearly July 4th Wknd |
Hartford E Hartford |
Closures | 2014 - Submitted (pumrum) |
Manchester Road Race | Yearly Thanksgiving Day |
Manchester | [1] | 2014 - Submitted (pumrum) |
First Night Hartford | Yearly New Years Eve |
Hartford | Event Site | 2014 - Not Yet Submitted |
Annual Closures
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Yale Ave b/w Derby & Chapel |
Approx 8/1/20XX (USER) |
Approx 9/7/20XX (USER) |
ROAD CLOSED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Shuttle Meadow Rd b/w Flanders & Ledge |
Approx 4/15/20XX (USER) |
Approx 11/15/20XX (USER) |
ROAD CLOSED Seasonal Closure per Southington PD |
Danbury
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Old Newtown Rd | Approx 9/8/20 (Jallen) |
Approx 11/6/20 (Jallen) |
ROAD CLOSED Intersection and safety improvements |
BOTG Pics |
Putnam
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Modock Rd | Approx 10/18/20 (Jallen) |
Approx 12/21/20 (Jallen) |
ROAD CLOSED Air Trail Construciton |
<LINK> |
River Rd | Approx 10/16/20 (harrypotter418) |
Approx 12/31/20 (harrypotter418) |
ROAD CLOSED Excavation & installation of tunnel |
Trails Committe Info |
Redding
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Station Rd | Approx 10/5/20 (Jallen) |
Approx 12/21/20 (Jallen) |
ROAD CLOSED Bridge Replacement |
Const Journal |
Waterbury
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Exit 19 Off-Ramp (I-84 Westbound to Route 8 Southbound) | Approx 10/18/20 (Jallen) |
Approx 10/24/20 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Bank Street On-Ramp (I-84 Westbound to Route 8 Southbound) | Approx 10/18/20 (Jallen) |
Approx 10/24/20 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Exit 33 Ramp (SR-8 NB to I-84 WB) | Approx 9/25/20 (Jallen) |
Approx 1/3/21 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Template
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
<ROAD NAME> | Approx 1/1/20XX (<USER>) |
Approx 9/7/20XX (<USER>) |
ROAD CLOSED Description |
<LINK> |