Nebraska/Construction: Difference between revisions Discussion View history

No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Please add as much information as possible to this page. Useful data includes street names, planned start and end dates, and a permalink to the location of the closure.
Please add as much information as possible to this page. Useful data include street names, start and end dates, and a permalink to the location of the closure.


== Road Closures ==
== Road Closures ==
Line 19: Line 19:
*Statewide:
*Statewide:
**[http://www.transportation.nebraska.gov/511/detours/construction-detours-info.pdf NDOR Closures and Detours]
**[http://www.transportation.nebraska.gov/511/detours/construction-detours-info.pdf NDOR Closures and Detours]
**[http://hb.511.nebraska.gov/#roadReports/search/layers=roadReports NDOR Road Reports Map]

Latest revision as of 20:07, 15 November 2014

Please add as much information as possible to this page. Useful data include street names, start and end dates, and a permalink to the location of the closure.

Road Closures

Northwest

Northeast

East-Central

West-Central

Southwest

Southeast