Connecticut/Closures: Difference between revisions Discussion View history

 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page.
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page.


<!-- These comments are very old and are likely more confusing to new editors
<!-- <del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>
<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>


<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
Line 57: Line 56:


==Danbury==
==Danbury==
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
Line 64: Line 63:
! scope="col" width="100" bgcolor="wheat" |Link
! scope="col" width="100" bgcolor="wheat" |Link
|-
|-
|'''[https://www.waze.com/en-US/editor?env=usa&lon=-73.42195&lat=41.40524&s=120952083&zoom=8&segments=511450068 Old Newtown Rd]'''
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.42195&lat=41.40524&s=120952083&zoom=8&segments=511450068 '''Old Newtown Rd''']
|Approx<br />9/8/20<br />(Jallen)
|Approx<br />9/8/20<br />(Jallen)
|Approx<br />11/6/20<br />(Jallen)
|Approx<br />11/6/20<br />(Jallen)
Line 74: Line 73:


==Putnam==
==Putnam==
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
Line 87: Line 86:
|[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>]
|[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>]
|-
|-
|'''[Https://www.waze.com/en-US/editor%3Fenv%3Dusa%26lon%3D-71.91396%26lat%3D41.88964%26s%3D3342204415%26zoom%3D8%26segments%3D85236239 River Rd]'''
|[Https://www.waze.com/en-US/editor%3Fenv%3Dusa%26lon%3D-71.91396%26lat%3D41.88964%26s%3D3342204415%26zoom%3D8%26segments%3D85236239 '''River Rd''']
|Approx<br />10/16/20<br />(harrypotter418)
|Approx<br />10/16/20<br />(harrypotter418)
|Approx<br />12/31/20<br />(harrypotter418)
|Approx<br />12/31/20<br />(harrypotter418)
Line 121: Line 120:
! scope="col" width="100" bgcolor="wheat" |Link
! scope="col" width="100" bgcolor="wheat" |Link
|-
|-
|'''[https://www.waze.com/en-US/editor?env=usa&lon=-73.04739&lat=41.55059&s=53843219&zoom=6&segments=70584266 Exit 19 Off-Ramp (I-84 Westbound to Route 8 Southbound)]'''
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.04739&lat=41.55059&s=53843219&zoom=6&segments=70584266 '''Exit 19 Off-Ramp''' (I-84 Westbound to Route 8 Southbound)]
|Approx<br />10/18/20<br />(Jallen)
|Approx<br />10/18/20<br />(Jallen)
|Approx<br />10/24/20<br />(Jallen)
|Approx<br />10/24/20<br />(Jallen)
Line 127: Line 126:
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
|-
|-
|'''[https://www.waze.com/en-US/editor?env=usa&lon=-73.04377&lat=41.55199&s=53843219&zoom=7&segments=61698396 Bank Street On-Ramp (I-84 Westbound to Route 8 Southbound)]'''
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.04377&lat=41.55199&s=53843219&zoom=7&segments=61698396 '''Bank Street On-Ramp''' (I-84 Westbound to Route 8 Southbound)]
|Approx<br />10/18/20<br />(Jallen)
|Approx<br />10/18/20<br />(Jallen)
|Approx<br />10/24/20<br />(Jallen)
|Approx<br />10/24/20<br />(Jallen)
Line 133: Line 132:
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
|-
|-
|'''[https://www.waze.com/en-US/editor?env=usa&lon=-73.05063&lat=41.55065&s=53843219&zoom=6&segments=61698556,518497101 Exit 33 Ramp (SR-8 NB to I-84 WB)]'''
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.05063&lat=41.55065&s=53843219&zoom=6&segments=61698556,518497101 '''Exit 33 Ramp''' (SR-8 NB to I-84 WB)]
|Approx<br />9/25/20<br />(Jallen)
|Approx<br />9/25/20<br />(Jallen)
|Approx<br />1/3/21<br />(Jallen)
|Approx<br />1/3/21<br />(Jallen)
Line 143: Line 142:
==Template==
==Template==
This is the template for the tables in this page.
This is the template for the tables in this page.
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)

Latest revision as of 19:45, 19 October 2020

Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.

Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.

Major Events

These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.

What When Where Link Status
Hartford Marathon Yearly
2nd Sat in Oct
Hartford
E/W Hartford
Closures 2014 - In Progress
(pumrum)

Minor Events

These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.

What When Where Link Status
Riverwalk Yearly
July 4th Wknd
Hartford
E Hartford
Closures 2014 - Submitted
(pumrum)
Manchester Road Race Yearly
Thanksgiving Day
Manchester [1] 2014 - Submitted
(pumrum)
First Night Hartford Yearly
New Years Eve
Hartford Event Site 2014 - Not Yet Submitted

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open
Shuttle Meadow Rd
b/w Flanders & Ledge
Approx
4/15/20XX
(USER)
Approx
11/15/20XX
(USER)
ROAD CLOSED
Seasonal Closure per
Southington PD

Danbury

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Old Newtown Rd Approx
9/8/20
(Jallen)
Approx
11/6/20
(Jallen)
ROAD CLOSED
Intersection and safety improvements
BOTG Pics

DOT Info

Putnam

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Modock Rd Approx
10/18/20
(Jallen)
Approx
12/21/20
(Jallen)
ROAD CLOSED
Air Trail Construciton
<LINK>
River Rd Approx
10/16/20
(harrypotter418)
Approx
12/31/20
(harrypotter418)
ROAD CLOSED
Excavation & installation of tunnel
Trails Committe Info

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Station Rd Approx
10/5/20
(Jallen)
Approx
12/21/20
(Jallen)
ROAD CLOSED
Bridge Replacement
Const Journal

Redding FB

Waterbury

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Exit 19 Off-Ramp (I-84 Westbound to Route 8 Southbound) Approx
10/18/20
(Jallen)
Approx
10/24/20
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT
Bank Street On-Ramp (I-84 Westbound to Route 8 Southbound) Approx
10/18/20
(Jallen)
Approx
10/24/20
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT
Exit 33 Ramp (SR-8 NB to I-84 WB) Approx
9/25/20
(Jallen)
Approx
1/3/21
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME> Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>