To Do - St. Louis, MO View history

Revision as of 12:52, 30 April 2010 by Misterasterix (talk | contribs)
Missouri Freeway Segment Area Manager Date Started Status Comment
I- 44 I- 55 to I- 270 MisterAsterix 04/19/10 Assigned Exits Overpasses ~75% done.
Outside I- 270 MisterAsterix 04/19/10 Assigned Started.
I- 55 PSB to I- 44 MisterAsterix 04/19/10 Complete ...
I- 44 to I- 255I- 270 MisterAsterix 04/19/10 Complete ...
Outside I- 255I- 270 MisterAsterix 04/19/10 In Progress Done to Arnold. Needs locking and some exit renaming
I- 64US Hwy- 40 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.

I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.

I- 270 to MO River: Most exits & overpasses complete. Needs locking.

MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to I- 170: Complete.

I- 170 to I- 270: Complete.

I- 270 to MO River: Complete.

MO River to MO- 370: Complete.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete.

I- 70 to I- 64: Complete.

I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking.

I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.

MO- 364 (aka Page Ave Extension) MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


Illinois Freeway Responsible Area Manager Date Started Status Comment
I- 55I- 70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Unassigned ...
I- 64 MisterAsterix 04/19/10 Assigned From I- 55I- 70 Split to I- 255: Complete.

I- 255 to I- 57: Complete from I- 255 to Exit 14

I- 70 TBD 04/19/10 Unassigned ...
I- 255 MisterAsterix 04/19/10 Completed JB Bridge to I- 64: Complete.

I- 64 to I- 55I- 70: Complete.

I- 55I- 70 to I- 270: Complete.

IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.
I- 270 MisterAsterix 04/19/10 Completed The River to I- 255IL- 255: Complete.

I- 255IL- 255 to I- 55I- 70: Complete.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 TBD 04/19/10 Assigned ...


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned See Illinois Freeways


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 04/19/10 Complete Complete though some experimenting going on to make driving instructions clearer.