Missouri Interstate Name | Responsible Area Manager | Date Started | Status | Comment |
I- 44 | MisterAsterix | 04/19/10 | Assigned | Overpasses and exits done from I- 55 to I- 270. some done outside I -270. |
I- 55 | MisterAsterix | 04/19/10 | Assigned | Exits and intersections done from River to Arnold. Needs locking and some exit renaming |
I- 64 | MisterAsterix | 04/19/10 | Assigned | All of the exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. Older stretch from from the river to Kingshighway is named but parts need locking |
I- 70 | MisterAsterix | 04/19/10 | Assigned | All overpasses done from the river to I- 270. Some exits need naming. |
I- 170 | MisterAsterix | 04/19/10 | Completed | Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.) |
I- 255 | MisterAsterix | 04/19/10 | Completed | Complete. |
I- 270 | MisterAsterix | 04/19/10 | Assigned | The river to I- 170: Complete.
I- 170 to I- 70: Complete. I- 70 to I- 64: Most overpasses done. Most exits named. Needs Locking. I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking. I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking. |
Illinois Interstate Name | Responsible Area Manager | Date Started | Status | Comment |
I- 55/70 | MisterAsterix | 04/19/10 | Completed | Completed |
I- 55 | TBD | 04/19/10 | Assigned | ... |
I- 64 | MisterAsterix | 04/19/10 | Assigned | Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches. |
I- 70 | MisterAsterix | 04/19/10 | Assigned | Just started |
I- 255 | MisterAsterix | 04/19/10 | Assigned | Overpasses complete. Exits 90% Complete. Locking has started |
I- 270 | MisterAsterix | 04/19/10 | Assigned | Overpasses complete. Some Exits need naming. Locking has started near river. |
US Highway Name | Responsible Area Manager | Date Started | Status | Comment |
US- 40 in IL | TBD | 04/19/10 | Unassigned | ... |
US- 61 | TBD | 04/19/10 | Unassigned | ... |
US- 67 | TBD | 04/19/10 | Unassigned | ... |
US- 367 | TBD | 04/19/10 | Unassigned | ... |
MO Highway Name | Responsible Area Manager | Date Started | Status | Comment |
MO- 94 | MisterAsterix | 04/19/10 | Assigned | ... |
MO- 364 | MisterAsterix | 04/19/10 | Assigned | Exits and overpasses 90% complete to MO- 94. Needs locking. |
MO- 370 | MisterAsterix | 04/19/10 | Assigned | Exits and Overpasses named and complete. Needs locking. |
IL Highway Name | Responsible Area Manager | Date Started | Status | Comment |
IL- 255 | MisterAsterix | 04/19/10 | Assigned | Road laid. Exits done from I- 255 to Wood River exit. Needs locking. |
Major Intersection | Responsible Area Manager | Date Started | Status | Comment |
Poplar Street Bridge (I- 55/64/70) | MisterAsterix | 00/00/10 | Complete | Complete though some experimenting going on to make driving instructions clearer. |