Line 231: | Line 231: | ||
* [https://www.waze.com/editor/?zoom=3&lat=41.35196&lon=-71.77587&layers=1925&env=usa&segments=66024795,66024794,66024791,66024787,76309240,66892888,67182175,67182115,66024671 L5: Upgrade Post Rd to Major Hwy] | * [https://www.waze.com/editor/?zoom=3&lat=41.35196&lon=-71.77587&layers=1925&env=usa&segments=66024795,66024794,66024791,66024787,76309240,66892888,67182175,67182115,66024671 L5: Upgrade Post Rd to Major Hwy] | ||
== Proposed Freeways == | |||
This section is for proposed upgrades of Major Highways to Freeways that meet the definition of "controlled-access highway." This is only a draft, please do not change the road type of these roads until consensus is reached. | |||
All numbers are for state highways unless otherwise denoted. | |||
Airport Connector Rd | |||
US-6 between I-295 and I-195 | |||
4 between 102 and I-95 | |||
10 | |||
24 | |||
37 | |||
78 | |||
79 | |||
99 | |||
138 between US-1 and 238 | |||
140 | |||
146 | |||
403 between US-1 and 4 | |||
[[Category:Rhode Island]] [[Category:USA To Do]] | [[Category:Rhode Island]] [[Category:USA To Do]] |
Revision as of 13:37, 6 June 2014
Want to help out with the map in Rhode Island? Below is a list of projects that need to be done. Please see Map Editing & Editing Best Practices for a starting point on how to edit the map.
When you are done, please update the info & turn the background gray. If you need help see How to edit wiki pages. Sounds scary but it's easy just watch this short video.
Freeways
Freeway Name | Responsible Area Manager | Date Started | Status | Comment |
---|---|---|---|---|
I-95 | AndyPoms | 12/27/2012 | Complete | Also, See Major Intersections Below |
I-195 | AndyPoms | 12/27/2012 | Complete | Also, See Major Intersections Below |
I-295 | AndyPoms | 12/27/2012 | Complete |
US Highways
US Highway Name | Responsible Area Manager | Date Started | Status | Comment |
---|---|---|---|---|
US-1 | AndyPoms | 12/27/2012 | Complete | Major Highway portion between Charlestown & RI-4 |
US-6 | AndyPoms | 12/27/2012 | Complete | Major Highway portion between I-295 & RI-10/I-95 |
State Highways
RI Highway Name | Responsible Area Manager | Date Started | Status | Comment |
---|---|---|---|---|
RI-4 | AndyPoms | 12/27/2012 | Complete | |
RI-10 | AndyPoms | 12/27/2012 | Complete | |
RI-24 | AndyPoms | 12/28/2012 | Complete | |
RI-37 | AndyPoms | 12/27/2012 | Complete | |
RI-78 | AndyPoms | 12/27/2012 | Complete | Westerly Bypass |
RI-99 | AndyPoms | 12/27/2012 | Complete | |
RI-114 | AndyPoms | 12/27/2012 | Complete | |
RI-146 | AndyPoms | 12/27/2012 | Complete | |
RI-183 | AndyPoms | 12/27/2012 | Complete | |
RI-403 | AndyPoms | 12/27/2012 | Complete | |
Unnumbered | AndyPoms | 12/27/2012 | Complete | TF Green Airport Connector Road |
Major Intersections
Major Intersection I- 94 | Responsible Area Manager | Date Started | Status | Comment |
---|---|---|---|---|
I-95 & I-195 | AndyPoms | 9/7/2013 | Complete | Ramps need names & layout confirmation |
Functional Classifications
This section tracks the progress of updating RI roads to match the new functional classification standards as discussed here.
Changes should be based on the RIDOT Functional Classification Map
Town | Editor | Date Started | Progress | Comment |
---|---|---|---|---|
Barrington | GooberKing | 06/02/2014 | 75% |
|
Bristol | GooberKing | 06/01/2014 | 98% |
|
Burrillville | ||||
Central Falls | grsing | 06/05/2014 | 100% | |
Charlestown | GooberKing | 05/29/2014 | 95% |
|
Coventry | ||||
Cranston | grsing | 6/4/2014 | 60% | Did most/all of area within 2 miles of 95. Some locks below, and remainder of city needs to be done entirely. |
Cumberland | ||||
East Greenwich | GooberKing | 06/02/2014 | 98% |
|
East Providence | GooberKing | 06/04/2014 | 85% |
|
Exeter | ||||
Foster | ||||
Glocester | ||||
Hopkinton | GooberKing | 05/29/2014 | 95% |
|
Jamestown | GooberKing | 05/26/2014 | 90% |
|
Johnston | ||||
Lincoln | ||||
Little Compton | ||||
Middletown | GooberKing | 05/26/2014 | 95% |
|
Narragansett | GooberKing | 05/28/2014 | 80% |
|
New Shoreham | ||||
Newport | GooberKing | 05/26/2014 | 95% |
|
North Kingstown | GooberKing | 05/28/2014 | 85% |
|
North Providence | ||||
North Smithfield | ||||
Pawtucket | grsing | 06/4/2014 | 99% | All but two unlocks |
Portsmouth | GooberKing | 05/26/2014 | 100% | |
Providence |
grsing GooberKing |
6/4/2014 | 85% |
|
Richmond | GooberKing | 05/26/2014 | 95% |
|
Scituate | ||||
Smithfield | KyleLechman | 06/04/2014 | 100% | |
South Kingstown | GooberKing | 05/28/2014 | 100% | |
Tiverton | GooberKing | 05/15/2014 | 98% |
|
Warren | GooberKing | 06/03/2014 | 100% | |
Warwick | grsing | 6/4/2014 | 25% | SH2 locked, needs upgrade to Major Hwy; other roads beyond my editable area, a few miscellaneous unlocks, could definitely use a second set of eyes |
West Greenwich | ||||
West Warwick | ||||
Westerly | GooberKing | 05/26/2014 | 95% |
|
Woonsocket |
Unlock Requests
This section is for outlining update requests for higher level editors. If a request is needed, please specify the minimum level required, a description of the request, and a link to the segments in question. Once each request has been dealt with, remove it from the list.
Cranston
East Greenwich
East Providence
Jamestown
Newport
Pawtucket
Providence
- L5: Major Highway
- L5: Minor Highway
- L3: Major Highway
- L3: Minor Highway
- L3: Primary St (something weird going on here, all the turn restrictions prevent turning on this road, nothing abnormal in street view, can see cars on it on satellite and street view)
Westerly
Proposed Freeways
This section is for proposed upgrades of Major Highways to Freeways that meet the definition of "controlled-access highway." This is only a draft, please do not change the road type of these roads until consensus is reached.
All numbers are for state highways unless otherwise denoted.
Airport Connector Rd US-6 between I-295 and I-195 4 between 102 and I-95 10 24 37 78 79 99 138 between US-1 and 238 140 146 403 between US-1 and 4