Connecticut/Closures: Difference between revisions View history

No edit summary
Line 70: Line 70:
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|}
== Griswold ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.60993&lon=-71.9391&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=72142079 '''Edmond Rd''']<br/>b/w Hopeville Rd & Dudek Rd || 3/29/2013<br/>(AndyPoms) || Anticipated<br/>11/2013 || '''BRIDGE REPLACEMENT'''<br/>The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November.  During the construction period, a detour will direct trafficaround the closure via Norman Road.
|| [http://www.griswold-ct.org/ Town of Griswold]
|-
|-
|}
|}

Revision as of 01:38, 30 March 2013

Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page.

Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.

On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([1]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).

Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.

Branford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
6/28/2012
(AndyPoms)
Unknown SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Chester

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Water St
b/w N Main St & E Liberty St
11/9/2012
(AndyPoms)
12/24/2012
(AndyPoms))
REOPENED
BRIDGE REPLACEMENT
Description
Town of Chester

Darien

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
3/22/2012
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Fairfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
5/7/2012
(Jallen)
NB:12/12/12 (AndyPoms)
SB:2/1/13 (AndyPoms)
REOPENED
SERVICE PLAZAS CLOSED

Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Cornell Rd
b/w Westbrook Pl & White Oak Rd
10/12/2012
(AndyPoms)
Anticipated
12/2012-1/2013
BRIDGE REPLACEMENT
REOPENED
BRIDGE REPLACEMENT
Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. NOTE: AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again.
Town of Fairfield
Merritt St
at Valley Rd
11/27/2012
(AndyPoms)
Anticipated
7/2013
BRIDGE REPLACEMENT
Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area.
Town of Fairfield

Greenwich

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Griswold

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edmond Rd
b/w Hopeville Rd & Dudek Rd
3/29/2013
(AndyPoms)
Anticipated
11/2013
BRIDGE REPLACEMENT
The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road.
Town of Griswold

Hamden

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Tuttle Ave
b/w Dunn Rd & River Rd
12/4/2012
(AndyPoms)
Spring
2013
BRIDGE REPLACEMENT
Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant. At this time they do not promise, but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring."
Town of Hamden

Hartford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Elliott St E
b/w Wethersfield & Ledyard St
10/14/2012
(AndyPoms)
11/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED

MDC Sewer Separation Project
MDC
Flower St
b/w Farmington & Capital
11/27/2012
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Busway Construction
Closure Starts 12/3/2012
CT fastrak
Granby St
b/w Tower & Ledyard
10/14/2012
(AndyPoms)
Unknown ROAD CLOSED
MDC Sewer Separation Project
MDC
Sigourney St.
b/w Homestead & Sargent
4/1/2012
(AndyPoms)
Anticipated
6/30/2013
ROAD CLOSED
Bridge Replacement
ConnDOT

*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.

Killingly

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
River Rd
b/w Mason Hill Rd & Cutler Rd
10/26/2012
(AndyPoms)
11/3/2012
(AndyPoms)
REOPENED
BRIDGE REPLACEMENT
Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening.
UPDATE 11/3/2012: According to Town Manager, There are two bridges on River Road in Killingly. Both bridges were closed to traffic in April 2011 due to storm damage. Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...)
Town of Killingly

Meriden

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cook Ave
b/w Summer St & Meridian St
10/10/2012
(AndyPoms)
12/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
CT DOT Project 79-215.
ConnDOT

Middletown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Arrigoni Br
b/w Middletown & Portland
5/1/2011
(AndyPoms)
Anticipated
11/7/2012
ONE LANE EACH DIRECTION
Bridge Replacement
No Closures-traffic pattern changes.
Silver St b/w Brownstone and Main-One Way Westbound.
ConnDOT

Montville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-395 S
10/22/2012
(AndyPoms)
Unknown SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas
Montville Rd
b/w Salen Tpke & Leffingwell Rd
11/1/2012
(AndyPoms)
Unplanned BRIDGE OUT
AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out."
User Report

New Britain

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Long Swamp Rd
b/w Slater Rd & Alton Brooks Way
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way."

AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not.
User Report

New Canaan

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Mariomi Rd
b/w Valley Rd & Thayer Pond Rd
2/15/2013
(AndyPoms)
Approx
5/2013
BRIDGE REPLACEMENT
Started May, 2012, reported by user Feb, 2013. Project anticipated to last 1 year.
Town of New Canaan

New Haven

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
State St.
b/w Lawrence & James
10/12/2010
(AndyPoms)
Anticipated
10/2011
2/2012
4/30/2013
ROAD CLOSED
Bridge Replacement (CT DOT Project #0092-0561)
ConnDOT
Trumbull St.
b/w Orange & Whitney
11/28/2011
(AndyPoms)
3/12/2013
(AndyPoms)
REOPENED TWO WAY
ONE WAY (WESTBOUND)
Sewer Separation Project
City of New Haven
I-95
b/w Exit 46 & Exit 54
June 2002
Anticipated
Fall 2016
MAJOR PROJECT
Expect Lane & Road & Ramp Closures at all times (mostly overnight)
I-95 New Haven
Yale Ave
b/w Derby & Chapel
7/30/2012
(AndyPoms)
8/30/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Norwalk

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cedar St.
b/w Connecticut Ave (US-1) & Summit Ave
8/21/2012
(AndyPoms)
Anticipated
11/2013
ROAD CLOSED
Bridge Replacement
ConnDOT
Triangle St.
b/w Norden Plaza & Howard Ave
7/29/2012
(AndyPoms)
Anticipated
11/8/2012
ROAD CLOSED
Bridge Replacement
ConnDOT
Rampart Rd
b/w Connecticut Ave & Jomar Rd
2/10/2012
(Jallen)
8/13/2012
(jeberhard)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

Orange

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Plainfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-395 N & S
6/21/2012
(AndyPoms)
10/22/2012
(AndyPoms)
REPOPENED
SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Simpaug Tpke
b/w Marchant Rd & Picketts Ridge Rd
10/10/2011
(Jallen)
Anticipated
June 2012
10/29/2012
12/6/2012
Bridge Replacement
Replacement of the bridge over the Metro-North Railroad

Stamford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edison Rd
b/w Merrell Ave & Stamford Hospital
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project
Stamford Hospital

Trumbull

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Madison Ave
b/w Plattsville Rd & Hitching Post Ln
7/9/2012
(AndyPoms)
9/28/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

Westport

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
North Ave
at Coleytown Rd
3/29/2013
(AndyPoms)
Approx
4/14/2013
BRIDGE REPLACEMENT
Road Closed north of Coleytown Rd to complete bridge reconstruction.
Town of Westport
Ketchum St
b/w Riverside Ave & #7 Ketchum
2/8/2013
(AndyPoms)
Approx
4/14/2013
ROAD CLOSED
Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12
Town of Westport

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME>
b/w <CROSS STREETS>
Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>