< Connecticut | Closures
Kentsmith9 (talk | contribs) m (Kentsmith9 moved page Connecticut/Test/Closures/Main to Connecticut/Closures/Main without leaving a redirect: Prep for new main page) |
|||
Line 1: | Line 1: | ||
<!-- This page is only transcluded into (displayed on) the main page for this state. See more detailed instructions below. --><noinclude>{{:USA/CommonState/ReturnPurge|{{SubPage2}}}}<br/></noinclude><!-- | <!-- This page is only transcluded into (displayed on) the main page for this state. See more detailed instructions below. --><noinclude>{{:USA/CommonState/ReturnPurge|{{SubPage2}}}}<br/></noinclude><!-- | ||
------ DO NOT MODIFY ABOVE THIS LINE -------- DO NOT MODIFY ABOVE THIS LINE ------> | ------ DO NOT MODIFY ABOVE THIS LINE -------- DO NOT MODIFY ABOVE THIS LINE ------> | ||
The following table tracks LONG TERM road closures and changes to traffic flow in the State of Connecticut. All closures with a duration of at least a month should be added to the list after a closure has been created to assist with ensuring proactive management of closures as work is completed. | |||
For access to the list, or to suggest updates or additions, please contact [https://wazeopedia.waze.com/wiki/USA/Connecticut#Area_Managers senior editors and Area Managers] | |||
{{#widget:Iframe | |||
|url=https://docs.google.com/spreadsheets/d/e/2PACX-1vQvQz4dV4VaVM6BGN4DqAyC6mRyJapxVQ163nePKPm8j-NGGfBKBkFS3qLQZ-Htoli6tOoK1_l6OEQn/pubhtml?widget=true&headers=false | |||
|width=100% | |||
|height=450 | |||
|border=1 | |||
}} | |||
<!---- DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ---- | <!---- DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ------ DO NOT MODIFY BELOW ---- | ||
------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------- |
Revision as of 20:33, 19 October 2020
The following table tracks LONG TERM road closures and changes to traffic flow in the State of Connecticut. All closures with a duration of at least a month should be added to the list after a closure has been created to assist with ensuring proactive management of closures as work is completed.
For access to the list, or to suggest updates or additions, please contact senior editors and Area Managers