Oregon/Closures/Main: Difference between revisions View history

Line 13: Line 13:
|-
|-
| Old McKenzie Pass OR-242
| Old McKenzie Pass OR-242
| AlanOfTheBerg
| FzNk
| 2016-11
| 2017-09
| Summer 2017
| Unknown
|  
|  
Both gates closed for the winter.
Both gates closed due to the Milli Fire and may remain closed for the season.


KEEP THE FOLLOWING FOR FUTURE REFERENCE:
KEEP THE FOLLOWING FOR FUTURE REFERENCE:
Line 35: Line 35:
!width="15%"|Est Compl Date
!width="15%"|Est Compl Date
!width="60%"|Links and comments
!width="60%"|Links and comments
|-
|I-5 @ Exit 24 Fern Valley Interchange (Phoenix)
|April 2014 - 2016
|The Fern Valley interchange has been constructed using a 'crossing' or 'diverging diamond' design that provides a higher capacity to move traffic while requiring lower right-of-way needs.  At this time, we do not believe the bridge will require any special mapping for the reversed traffic flow.
AlanOfTheBerg has upgraded several area roadways to Major Highway or Minor Highway or Primary Street in order to encourage Waze navigation to more easily accept these alternate routes.
The project has fully opened to traffic.  The remaining work should not affect traffic.
http://www.tripcheck.com/Pages/CCview.asp?Num=2&cam1=2627&cam2=2623 Traffic Cameras in the area]
[http://www.oregon.gov/ODOT/HWY/REGION3/docs/UPDATEDFVInterchangePhoenixCCMarch2013.pdf August 2013 City Council meeting with some detailed final and interim road maps.]
[http://www.oregon.gov/ODOT/HWY/REGION3/Pages/fvi_index.aspx ODOT Fern Valley Interchange Project Page]
[https://www.waze.com/editor/?zoom=5&lat=42.28134&lon=-122.81523&env=usa WazeMap]
|-
|-
|US-20 Pioneer Mountain to Eddyville
|US-20 Pioneer Mountain to Eddyville
|Phase 4: 2016
|Phase 5: 2017
Phase 5: 2017
|ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation.
|ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation.


Line 61: Line 45:


[https://www.waze.com/editor/?zoom=0&lat=44.64356&lon=-123.84449&layers=BTFTFTTFTFTFTTTTT WazeMap]
[https://www.waze.com/editor/?zoom=0&lat=44.64356&lon=-123.84449&layers=BTFTFTTFTFTFTTTTT WazeMap]
|-
|US-26 Safety and Preservation Project
|2014 - 2016
|Safety improvements to a section of US-26 west of Government Camp.  Map Curve will be realigned to create a softer turn.
[http://www.oregon.gov/ODOT/HWY/REGION1/pages/mthood/project_mhh_safety.aspx ODOT Project Page]
[https://www.waze.com/editor/?env=usa&lon=-121.81591&lat=45.30519&layers=3569&zoom=3 WME Link]
|-
|-
|Newberg-Dundee Bypass
|Newberg-Dundee Bypass
|2013-2016
|2013-2017
|Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction is planned to begin in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on 219 then to S Sprinbrook RD. then to 99w.
|Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction began in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on OR219 then to S Sprinbrook RD. then to 99W.
 
[http://oregonjta.org/region2/?p=highway99w ODOT Newberg-Dundee Bypass Project Page]
 
To see the map of the new HWY section see [http://oregonjta.org/region2/files/highway99w/maps/phase1final_reduced.pdf Map of new HWY]
[https://www.waze.com/editor/?zoom=2&lat=45.29484&lon=-122.98291&layers=BFTFTTTFTTFTFTTFTTTTFT WazeMap]
|-
|OR 140 Ritter Road to Deer Run Road
|2014 - 2016
|A 9.2-mile section of OR 140 will be straightened, widened, and repaved.
Realignment has been completed north of [https://www.waze.com/editor/?env=usa&lon=-121.39754&lat=42.35406&zoom=6 Dinner Plate Quarry].  Segments have been adjusted using project maps and the GPS points layer.
[http://www.oregon.gov/ODOT/HWY/REGION4/pages/or140_ritter_rd_deer_run_rd/or140_ritter_rd_deer_run_rd.aspx ODOT Project Page]


[https://www.waze.com/editor/?env=usa&lon=-121.38394&lat=42.34803&layers=1973&zoom=1 WME Link]
[http://www.oregon.gov/odot/projects/pages/project-details.aspx?project=16901 ODOT Newberg-Dundee Bypass Project Page]
|}
|}



Revision as of 16:41, 18 September 2017


Road Closures

This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.

Road Name Editor Closed Date Est Open Date Links and comments
Old McKenzie Pass OR-242 FzNk 2017-09 Unknown

Both gates closed due to the Milli Fire and may remain closed for the season.

KEEP THE FOLLOWING FOR FUTURE REFERENCE:

Area Places for the closure gates should be large in the winter for better app visibility. Shrink the area in the summer.

West-end Gate @ MP61.91

East-end Gate @ MP83.71

Future New or Realigned Roads

Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.

Road Or Project Name Est Compl Date Links and comments
US-20 Pioneer Mountain to Eddyville Phase 5: 2017 ODOT is bypassing a winding section of existing US-20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation.

The new section of US-20 opened to traffic Fall 2016. Tie-in work continues on the west end of the project.

ODOT Project Page

WazeMap

Newberg-Dundee Bypass 2013-2017 Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction began in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on OR219 then to S Sprinbrook RD. then to 99W.

ODOT Newberg-Dundee Bypass Project Page