Hawkeygoal (talk | contribs) |
Hawkeygoal (talk | contribs) No edit summary |
||
Line 24: | Line 24: | ||
:* The elevation of road segments completely or transitionally sub-surface should be negative and one less than (-1) the surface, tunnel, or level immediately above. | :* The elevation of road segments completely or transitionally sub-surface should be negative and one less than (-1) the surface, tunnel, or level immediately above. | ||
:* Ramps should be set to the lower elevation of the roadways to which it junctions unless they themselves pass over or under other segments as described above. | :* Ramps should be set to the lower elevation of the roadways to which it junctions unless they themselves pass over or under other segments as described above. | ||
===== Segmentation ===== | ===== Segmentation ===== | ||
Line 36: | Line 35: | ||
:* Do not create an elevated segment less than 200 feet (60m) in length. | :* Do not create an elevated segment less than 200 feet (60m) in length. | ||
:* Sub-surface segments should be cut at least 50 feet (15m) before, or after, the entrance to the subterranean section. | :* Sub-surface segments should be cut at least 50 feet (15m) before, or after, the entrance to the subterranean section. | ||
===== Culverts ===== | ===== Culverts ===== | ||
A ''culvert'' is a tunnel allowing a stream or open drain to pass under a roadway. Under normal circumstances these are not to be addressed by True Elevation mapping. However, an elevated segment for | A ''culvert'' is a tunnel allowing a stream or open drain to pass under a roadway. Under normal circumstances these are not to be addressed by True Elevation mapping. However, an elevated segment for a culvert may be created to support real-time closures (due to flooding or repair) when all these conditions are met: | ||
:* Is of significant construction requiring multiple day closures to repair. | :* Is of significant construction requiring multiple day closures to repair. | ||
:* Is not located near the center of the segment. | :* Is not located near the center of the segment. |
Revision as of 02:33, 20 February 2017
Overview
The goal of this page update is add additional guidance on the handling of elevation relative to overpasses in Illinois by revising the Major roads section of the Illinois wiki.
This new page is currently undergoing modifications. The information presented should be considered a draft, not yet ready for use. Content is being prepared by one or more users. Do not make any changes before you send a private message to this user. |
This a proposal development page for the Illinois state wiki. This page should never be considered official guidance. Please refer to Illinois for official state guidance. |
Content
True Elevation
In Illinois, an expanded implementation of the general guidance for elevation and overpasses, underpasses, and bridges, has been adopted. Please refer to the these sections for additional guidance.
True Elevation refers to layers of road decks supported above and below the terrain (ground) with open space between them. In essence, any road segment which a bird, such as a hawk, could fly underneath should be elevated above ground level. The inverse condition applies to tunnels or multi-level underground segments where your average groundhog could tunnel between them.
What is an overpass? An overpass is a general term for any road, walkway, railroad, bridge, or other mapped structure crossing over an impediment such as a waterway, natural formation, or another road, walkway, railroad, or bridge. In our mapping context it can also be conceptualized underground where tunnels crossing over, or under, one another.
Elevation
Apply these points to the use of elevation:
- All surface roads when not supported above or tunneled below the terrain are set to ground elevation unless otherwise described in this section.
- If a road segment is supported above the terrain or another road segment, the elevation of the segment should be set one higher (+1) than the segment or terrain (ground) immediately underneath.
- The elevation of road segments completely or transitionally sub-surface should be negative and one less than (-1) the surface, tunnel, or level immediately above.
- Ramps should be set to the lower elevation of the roadways to which it junctions unless they themselves pass over or under other segments as described above.
Segmentation
When creating segments to implement this guidance, please observe these precepts:
- Create junction nodes for elevation purposes at the point the physical change in elevation occurs unless otherwise guided in this section.
- Do not cut a segment within 200 feet (60m) of an existing junction.
- Do not create an elevated segment less than 200 feet (60m) in length.
- Sub-surface segments should be cut at least 50 feet (15m) before, or after, the entrance to the subterranean section.
Culverts
A culvert is a tunnel allowing a stream or open drain to pass under a roadway. Under normal circumstances these are not to be addressed by True Elevation mapping. However, an elevated segment for a culvert may be created to support real-time closures (due to flooding or repair) when all these conditions are met:
- Is of significant construction requiring multiple day closures to repair.
- Is not located near the center of the segment.
- The segment is heavily populated by potential destinations and a route to the wrong end of the segment would result in a manual detour of more than one mile.
Discussion
This proposal is still being drafted prior to open discussion.