Ohio/Construction: Difference between revisions View history

(added table at beginning)
(added template at top)
Line 1: Line 1:
{{construction
| contact    =
| contacttype =
| draft      = yes
| open        = yes
| revision    = yes
| talk        = yes
}}


A significant amount of information on this page is no longer valid. Please refer to the national Best Practices guidance until this page can be revised.
A significant amount of information on this page is no longer valid. Please refer to the national Best Practices guidance until this page can be revised.

Revision as of 23:00, 19 September 2014

This revision of the page is currently undergoing modifications. The information presented should be considered a draft, not yet ready for use. If you would like to contribute to this content, please consider posting in the US Wiki Discussion forum first to discuss your ideas. Please use the talk page for thoughts and ideas on setting up this content.

A significant amount of information on this page is no longer valid. Please refer to the national Best Practices guidance until this page can be revised.

A significant amount of information on this page is no longer valid. Please refer to the national Best Practices guidance until this page can be revised.

Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page. You can also see the Ohio mapping resources page for information specific to the state.

As of April 21, 2013 Waze daily map updates contain deltas as of the previous day. Please only include map changes that will be in place 24 hours a day for at least two days, and be sure to plan your Construction updates accordingly (i.e. several days in advance).

Akron

Cleveland

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
I-90 WB
Ontario St & E 9th St Entrance Ramps
11/11/2013
(LeeMeister)
Anticipated
Late Nov 2013
RAMPS OPEN WITHOUT ACCESS TO I-71 SB
Cleveland Innerbelt Bridge Project/Westbound Span
At 6am these ramps will open to the new bridge, but without access to I-71 SB until all traffic is cut over to the new bridge later in November 2013.
ODOT
Permalink
I-90/Innerbelt
Ontario St Exit Ramp
11/8/2013
(LeeMeister)
Anticipated
Late 2016
RAMP CLOSED
Cleveland Innerbelt Bridge Project/Eastbound Span
ODOT
Permalink
I-90/Innerbelt
E 14th St Entrance Ramp
11/8/2013
(LeeMeister)
Anticipated
Late 2016
RAMP CLOSED
Cleveland Innerbelt Bridge Project/Eastbound Span
ODOT
Permalink
I-90/Innerbelt
I-77 Entrance Ramp / E 22nd St & Carnegie Ave Exit Ramps
10/4/2013
(LeeMeister)
Anticipated
Late 2016
CHANNELIZERS INSTALLED
Cleveland Innerbelt Bridge Project/Eastbound Span
I-90 EB motorists from the Innerbelt Bridge will not be able to exit to E 22nd St or Carnegie Avenue. Only motorists entering I-90EB from I-77NB will be able to exit at these ramps.
ODOT
Permalink
I-77 SB
E 21st St Entrance Ramp
11/7/2013
(LeeMeister)
Anticipated
Late 2016
RAMP CLOSED
Cleveland Innerbelt Bridge Project/Eastbound Span
ODOT
Permalink
I-90 EB
Eddy Rd Exit/Entrance Ramps
10/28/2013
(LeeMeister)
Anticipated
May 2014/Oct 2014
RAMP CLOSED
Eddy Rd over I-90 bridge replacement
Phase I will close I-90 EB exit ramp. Phase II will close I-90 EB entrance ramp in May 2014 and project will complete in Oct 2014.
ODOT
Permalink

Columbus

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
I-71 / I-670 Unknown Unknown Reconfiguration
ODOT
Warner Rd
Between Ulry and Hamilton
April 2013
jhfrontz
October 2013 West-bound closed
Paving the Way

Dayton

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
I-75/ SR-4 10/8/2010
(Ryanh85)
Anticipated
September 2013
Reconfiguration
reworking ramp flow
ODOT
Permalink
I-75
US-35-SR-4
October 2010
(Ryanh85)
Anticipated
Sept 2015
Reconfiguration
rework exits, continuous lanes
ODOT Search
Permalink
US-35
ramps to I-75 N
May 2012
(Ryanh85)
Anticipated
February 2013
Reconfiguration
The ramps from US 35 eastbound and westbound to I-75 northbound will be closed
ODOT
Permalink

Hebron

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Canal Rd
Under I-70
4/21/2013
(jhfrontz)
Anticipated
June 2013
ROAD CLOSED
I-70 bridge project
Newark Advocate
Permalink

Holmes County

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
US 62
Knox/Holmes county line
5/8/2013
(jhfrontz)
Anticipated
June 30 2013
ROAD CLOSED
Ped/bike tunnel project
Permalink

Macedonia

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Highland Rd
W of Roll and Hold Parkway
4/2/2012
(jhfrontz)
Anticipated
August 2013
ROAD CLOSED
Railroad Grade Separation Bridge
ODOT
Permalink

Newark

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Country Club Drive
Between Sharon Valley and Estate
4/21/2013
(jhfrontz)
Anticipated
August 2013
ROAD CLOSED City of Newark
Permalink
Moull St
Between King and 12th
4/21/2013
(jhfrontz)
Anticipated
May 2013
ROAD CLOSED City of Newark
Permalink
SR 16 W entrance ramp
Cedar St
4/21/2013
(jhfrontz)
Anticipated
June 2013
RAMP CLOSED
Railroad bridge work
ODOT
Permalink

Pickaway County

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Duvall Road
Between US 23 and Bulen-Pierce Road
December 2013
(TimC42)

Anticipated
April 2014 (TimC42)

Eastbound closed (Still one-way as of April 28)

ODOT
Permalink

Richfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Everett Rd
over I-77
6/18/2012
(FlyinRiz)
Anticipated
Sept. 2012
BRIDGE CLOSED
Bridge Re-decking
ODOT
Permalink

Roseville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Main St
Between 1st and Athens
4/21/2013
(jhfrontz)
Anticipated
July. 2013
BRIDGE CLOSED ODOT
Permalink

Templates

Single Row

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Name
Cross Streets
Start Date
(Username)
Anticipated
End Date
WHAT
Description
ODOT Search
Permalink

Multiple Rows

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Ext. Link
Permalink
Name
Cross Streets
Start Date
(Username)
Anticipated
End Date
WHAT
Description
ODOT Search
Permalink
Name2
Cross Streets
Start Date
(Username)
Anticipated
End Date
WHAT
Description
ODOT Search
Permalink