CTGreybeard (talk | contribs) (→Norwalk: Triangle St bridge reopened) |
(Undo revision 38349 by CTGreybeard (talk)) |
||
Line 237: | Line 237: | ||
|- align="center" | |- align="center" | ||
| [https://www.waze.com/editor/?zoom=7&lat=41.10486&lon=-73.42863&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61941471 '''Cedar St.''']<br/>b/w Connecticut Ave (US-1) & Summit Ave || 8/21/2012<br/>(AndyPoms) || Anticipated<br/>11/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=508658 ConnDOT] | | [https://www.waze.com/editor/?zoom=7&lat=41.10486&lon=-73.42863&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61941471 '''Cedar St.''']<br/>b/w Connecticut Ave (US-1) & Summit Ave || 8/21/2012<br/>(AndyPoms) || Anticipated<br/>11/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=508658 ConnDOT] | ||
|- | |||
|- align="center" | |||
| [https://www.waze.com/editor/?zoom=6&lat=41.10894&lon=-73.39377&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67027891 '''Triangle St.''']<br/>b/w Norden Plaza & Howard Ave || 7/29/2012<br/>(AndyPoms) || Anticipated<br/>11/8/2012 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=502644 ConnDOT] | |||
|- | |- | ||
|- align="center" bgcolor="#00ff00" | |- align="center" bgcolor="#00ff00" |
Revision as of 00:32, 20 June 2013
Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page.
Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.
On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([1]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).
Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.
Bethel
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Walnut Hill Rd near Taylor Rd |
4/1/2013 (CTGreybeard) |
Anticipated 9/18/2013 |
BRIDGE CLOSED Rebuild aging bridge over Limekiln Brook on Walnut Hill Rd. |
Town of Bethel |
Branford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-95 N & S |
6/28/2012 (AndyPoms) |
Unknown | SERVICE PLAZA CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Chester
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Water St b/w N Main St & E Liberty St |
11/9/2012 (AndyPoms) |
12/24/2012 (AndyPoms)) |
REOPENED Description |
Town of Chester |
Darien
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-95 N & S |
3/22/2012 (AndyPoms) |
NB:6/6/2013 (AndyPoms) |
SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Fairfield
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
5/7/2012 (Jallen) |
NB:12/12/12 (AndyPoms) SB:2/1/13 (AndyPoms) |
REOPENED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Cornell Rd b/w Westbrook Pl & White Oak Rd |
10/12/2012 (AndyPoms) |
Anticipated 12/2012-1/2013 |
BRIDGE REPLACEMENT Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. NOTE: AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again. |
Town of Fairfield |
Merritt St at Valley Rd |
11/27/2012 (AndyPoms) |
Anticipated 7/2013 |
BRIDGE REPLACEMENT Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area. |
Town of Fairfield |
Greenwich
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
2/1/2013 (AndyPoms) |
Unknown | SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Lockwood Ln b/w E Putnam Ave & Leonard Ave |
6/1/2013 (AndyPoms) |
Anticipated 11/30/2013 |
Bridge Replacement Project Construction stared April 1, 2013 |
Town of Greenwich |
Griswold
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Edmond Rd b/w Hopeville Rd & Dudek Rd |
3/29/2013 (AndyPoms) |
Anticipated 11/2013 |
BRIDGE REPLACEMENT The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road. |
Town of Griswold |
Hamden
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Tuttle Ave b/w Dunn Rd & River Rd |
12/4/2012 (AndyPoms) |
Spring 2013 |
BRIDGE REPLACEMENT Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant. At this time they do not promise, but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring." |
Town of Hamden |
Hartford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Elliott St E b/w Wethersfield & Ledyard St |
10/14/2012 (AndyPoms) |
11/12/2012 (AndyPoms) |
REOPENED MDC Sewer Separation Project |
MDC |
Flower St b/w Farmington & Capital |
11/27/2012 (AndyPoms) |
PERMANENT CLOSURE | ROAD PERMANENTLY CLOSED Busway Construction Closure Starts 12/3/2012 |
CT fastrak |
Granby St b/w Tower & Ledyard |
10/14/2012 (AndyPoms) |
Unknown | ROAD CLOSED MDC Sewer Separation Project |
MDC |
Sigourney St. b/w Homestead & Sargent |
4/1/2012 (AndyPoms) |
6/13/2013 (AndyPoms) |
REOPENED Bridge Replacement |
ConnDOT |
*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.
Killingly
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
River Rd b/w Mason Hill Rd & Cutler Rd |
10/26/2012 (AndyPoms) |
11/3/2012 (AndyPoms) |
REOPENED Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening. UPDATE 11/3/2012: According to Town Manager, There are two bridges on River Road in Killingly. Both bridges were closed to traffic in April 2011 due to storm damage. Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...) |
Town of Killingly |
Meriden
Middletown
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Arrigoni Br b/w Middletown & Portland |
5/1/2011 (AndyPoms) |
Anticipated 11/7/2012 |
ONE LANE EACH DIRECTION Bridge Replacement No Closures-traffic pattern changes. Silver St b/w Brownstone and Main-One Way Westbound. |
ConnDOT |
Montville
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-395 S |
10/22/2012 (AndyPoms) |
Unknown | SERVICE PLAZA CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Montville Rd b/w Salen Tpke & Leffingwell Rd |
11/1/2012 (AndyPoms) |
Unplanned | BRIDGE OUT AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out." |
User Report |
New Britain
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Long Swamp Rd b/w Slater Rd & Alton Brooks Way |
11/17/2012 (AndyPoms) |
Unknown | ROAD CLOSED UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way." AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not. |
User Report |
New Canaan
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Mariomi Rd b/w Valley Rd & Thayer Pond Rd |
2/15/2013 (AndyPoms) |
6/11/2013 (AndyPoms) |
REOPENED Started May, 2012, reported by user Feb, 2013. Project anticipated to last 1 year. |
Town of New Canaan |
New Haven
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
E Rock Rd. b/w Livingston & Farnum |
6/14/2013 (AndyPoms) |
Unknown | ROAD CLOSED Bridge Replacement |
E Rock Brg |
CT-34 At Exit 2 |
5/1/2013 (AndyPoms) |
PERMANENT CLOSURE | ROAD PERMANENTLY CLOSED Downtown Crossing Project Closure Starts 5/2/2013 |
City of New Haven |
State St. b/w Lawrence & James |
10/12/2010 (AndyPoms) |
Anticipated 4/30/2013 |
ROAD CLOSED Bridge Replacement (CT DOT Project #0092-0561) |
ConnDOT |
Trumbull St. b/w Orange & Whitney |
11/28/2011 (AndyPoms) |
3/12/2013 (AndyPoms) |
REOPENED TWO WAY Sewer Separation Project |
City of New Haven |
I-95 b/w Exit 46 & Exit 54 |
June 2002 |
Anticipated Fall 2016 |
MAJOR PROJECT Expect Lane & Road & Ramp Closures at all times (mostly overnight) |
I-95 New Haven |
Yale Ave b/w Derby & Chapel |
7/30/2012 (AndyPoms) |
8/30/2012 (AndyPoms) |
REOPENED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Norwalk
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Cedar St. b/w Connecticut Ave (US-1) & Summit Ave |
8/21/2012 (AndyPoms) |
Anticipated 11/2013 |
ROAD CLOSED Bridge Replacement |
ConnDOT |
Triangle St. b/w Norden Plaza & Howard Ave |
7/29/2012 (AndyPoms) |
Anticipated 11/8/2012 |
ROAD CLOSED Bridge Replacement |
ConnDOT |
Rampart Rd b/w Connecticut Ave & Jomar Rd |
2/10/2012 (Jallen) |
8/13/2012 (jeberhard) |
REOPENED Bridge Replacement |
ConnDOT |
Orange
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza CT-15 N & S |
2/1/2013 (AndyPoms) |
Unknown | SERVICE PLAZAS CLOSED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Plainfield
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Service Plaza I-395 N & S |
6/21/2012 (AndyPoms) |
10/22/2012 (AndyPoms) |
REPOPENED Part of reconstruction project of all CT Service Plazas |
CT Service Plazas |
Redding
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Simpaug Tpke b/w Marchant Rd & Picketts Ridge Rd |
10/10/2011 (Jallen) |
Anticipated 12/6/2012 |
Bridge Replacement Replacement of the bridge over the Metro-North Railroad |
Stamford
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Edison Rd b/w Merrell Ave & Stamford Hospital |
11/17/2012 (AndyPoms) |
Unknown | ROAD CLOSED UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project |
Stamford Hospital |
Trumbull
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Madison Ave b/w Plattsville Rd & Hitching Post Ln |
7/9/2012 (AndyPoms) |
9/28/2012 (AndyPoms) |
REOPENED Bridge Replacement |
ConnDOT |
Westport
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
North Ave at Coleytown Rd |
3/29/2013 (AndyPoms) |
Approx 4/14/2013 |
BRIDGE REPLACEMENT Road Closed north of Coleytown Rd to complete bridge reconstruction. |
Town of Westport |
Ketchum St b/w Riverside Ave & #7 Ketchum |
2/8/2013 (AndyPoms) |
Approx 4/14/2013 |
ROAD CLOSED Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12 |
Town of Westport |
Annual Closures
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Yale Ave b/w Derby & Chapel |
Approx 8/1/20XX (USER) |
Approx 9/7/20XX (USER) |
ROAD CLOSED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Template
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
<ROAD NAME> b/w <CROSS STREETS> |
Approx 1/1/20XX (<USER>) |
Approx 9/7/20XX (<USER>) |
ROAD CLOSED Description |
<LINK> |