(→Putnam) |
|||
Line 64: | Line 64: | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.42195&lat=41.40524&s=120952083&zoom=8&segments=511450068 '''Old Newtown Rd'''] | ||
|Approx<br />9/8/20<br />(Jallen) | |Approx<br />9/8/20<br />(Jallen) | ||
|Approx<br />11/6/20<br />(Jallen) | |Approx<br />11/6/20<br />(Jallen) | ||
Line 87: | Line 87: | ||
|[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>] | |[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>] | ||
|- | |- | ||
| | |[Https://www.waze.com/en-US/editor%3Fenv%3Dusa%26lon%3D-71.91396%26lat%3D41.88964%26s%3D3342204415%26zoom%3D8%26segments%3D85236239 '''River Rd'''] | ||
|Approx<br />10/16/20<br />(harrypotter418) | |Approx<br />10/16/20<br />(harrypotter418) | ||
|Approx<br />12/31/20<br />(harrypotter418) | |Approx<br />12/31/20<br />(harrypotter418) | ||
Line 121: | Line 121: | ||
! scope="col" width="100" bgcolor="wheat" |Link | ! scope="col" width="100" bgcolor="wheat" |Link | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.04739&lat=41.55059&s=53843219&zoom=6&segments=70584266 '''Exit 19 Off-Ramp''' (I-84 Westbound to Route 8 Southbound)] | ||
|Approx<br />10/18/20<br />(Jallen) | |Approx<br />10/18/20<br />(Jallen) | ||
|Approx<br />10/24/20<br />(Jallen) | |Approx<br />10/24/20<br />(Jallen) | ||
Line 127: | Line 127: | ||
|[https://mixmaster-rehab.com/the-project/about-the-project DOT] | |[https://mixmaster-rehab.com/the-project/about-the-project DOT] | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.04377&lat=41.55199&s=53843219&zoom=7&segments=61698396 '''Bank Street On-Ramp''' (I-84 Westbound to Route 8 Southbound)] | ||
|Approx<br />10/18/20<br />(Jallen) | |Approx<br />10/18/20<br />(Jallen) | ||
|Approx<br />10/24/20<br />(Jallen) | |Approx<br />10/24/20<br />(Jallen) | ||
Line 133: | Line 133: | ||
|[https://mixmaster-rehab.com/the-project/about-the-project DOT] | |[https://mixmaster-rehab.com/the-project/about-the-project DOT] | ||
|- | |- | ||
| | |[https://www.waze.com/en-US/editor?env=usa&lon=-73.05063&lat=41.55065&s=53843219&zoom=6&segments=61698556,518497101 '''Exit 33 Ramp''' (SR-8 NB to I-84 WB)] | ||
|Approx<br />9/25/20<br />(Jallen) | |Approx<br />9/25/20<br />(Jallen) | ||
|Approx<br />1/3/21<br />(Jallen) | |Approx<br />1/3/21<br />(Jallen) |
Revision as of 18:54, 19 October 2020
Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.
Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.
Major Events
Minor Events
These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.
What | When | Where | Link | Status |
---|---|---|---|---|
Riverwalk | Yearly July 4th Wknd |
Hartford E Hartford |
Closures | 2014 - Submitted (pumrum) |
Manchester Road Race | Yearly Thanksgiving Day |
Manchester | [1] | 2014 - Submitted (pumrum) |
First Night Hartford | Yearly New Years Eve |
Hartford | Event Site | 2014 - Not Yet Submitted |
Annual Closures
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Yale Ave b/w Derby & Chapel |
Approx 8/1/20XX (USER) |
Approx 9/7/20XX (USER) |
ROAD CLOSED Annual Closure for New Haven Open Tennis Tournament |
NH Open |
Shuttle Meadow Rd b/w Flanders & Ledge |
Approx 4/15/20XX (USER) |
Approx 11/15/20XX (USER) |
ROAD CLOSED Seasonal Closure per Southington PD |
Danbury
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Old Newtown Rd | Approx 9/8/20 (Jallen) |
Approx 11/6/20 (Jallen) |
ROAD CLOSED Intersection and safety improvements |
BOTG Pics |
Putnam
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Modock Rd | Approx 10/18/20 (Jallen) |
Approx 12/21/20 (Jallen) |
ROAD CLOSED Air Trail Construciton |
<LINK> |
River Rd | Approx 10/16/20 (harrypotter418) |
Approx 12/31/20 (harrypotter418) |
ROAD CLOSED Excavation & installation of tunnel |
Trails Committe Info |
Redding
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Station Rd | Approx 10/5/20 (Jallen) |
Approx 12/21/20 (Jallen) |
ROAD CLOSED Bridge Replacement |
Const Journal |
Waterbury
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Exit 19 Off-Ramp (I-84 Westbound to Route 8 Southbound) | Approx 10/18/20 (Jallen) |
Approx 10/24/20 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Bank Street On-Ramp (I-84 Westbound to Route 8 Southbound) | Approx 10/18/20 (Jallen) |
Approx 10/24/20 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Exit 33 Ramp (SR-8 NB to I-84 WB) | Approx 9/25/20 (Jallen) |
Approx 1/3/21 (Jallen) |
ROAD CLOSED Mixmaster construction |
DOT |
Template
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
<ROAD NAME> | Approx 1/1/20XX (<USER>) |
Approx 9/7/20XX (<USER>) |
ROAD CLOSED Description |
<LINK> |