Oregon/To do: Difference between revisions View history

No edit summary
mNo edit summary
Line 159: Line 159:
|Complete
|Complete
|
|
|}
== Road Closures ==
This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.
{|border="1" cellpadding="2" width="100%"
!width="15%"|Road Name
!width="15%"|Editor
!width="15%"|Closed Date
!width="15%"|Est Open Date
!width="60%"|Links and comments
|-
|OR180
|AlanOfTheBerg
|10/25/2011
|10/27/2011
|Railroad crossing reconstruction 7 miles East of Intersection with US20. Public Contact: Rick Little, 541.726.2442
[https://www.waze.com/cartouche/?zoom=4&lon=-123.69701&lat=44.66254&layers=BTFTTTTFTFTFTTTTT&landmarks=386246 WazeMap]
|}
== Future New or Realigned Roads ==
Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.
{|border="1" cellpadding="2" width="100%"
!width="20%"|Road Or Project Name
!width="15%"|Est Open Date
!width="60%"|Links and comments
|-
|I-5 at Del Rio Rd
|Sep 2011
|ODOT will replace the Del Rio bridge over I-5 at the Winchester Interchange (Exit 129). All ramps for Exit 129 will move and Del Rio Rd and OR99 will be realigned.
[http://www.oregon.gov/ODOT/HWY/REGION3/delrio.shtml ODOT Project Page]
[https://www.waze.com/cartouche/?zoom=4&lon=-123.3595&lat=43.29159&layers=BTFTTTTFTFTFTTTTT&segments=62910090 WazeMap]
|}
|}



Revision as of 23:03, 26 October 2011

This page is intended to inform map editors on what is being worked on or is completed in the State of Oregon, as well as what is planned according to ODOT or other cities as we find out about them. The last section has transportation and highway resource links for the state.

As of creation of this page, there are two primary active area managers that either have all or a majority of Oregon in their editing permissions. If you have any questions, or need guidance, please feel free to contact them.

Please remember to follow all standards of editing, documented in this wiki. By marking a project complete, you are stating that the work was done following the standard set down by the community (or as best as possible in case where scenarios don't fit any of the standards documented).

Area Managers

AM Contact Notes
User:Rallychris Forum PM
Alan Email or PM State-wide AM for WA, OR, ID

Interstate

Name Editor(s) Status Comments
I-5 AlanOfTheBerg,

RallyChris

99% complete Full length from Washington to California border is intact and should be routable. There may be some exceptions to properly named exits.
File:I-82.png I-82 AlanOfTheBerg,

RallyChris

99% complete Full length from Portland to the Idaho border is intact and should be routable. There may be some exceptions to properly named exits.
I-84 AlanOfTheBerg
File:I-82.png I-82 AlanOfTheBerg,

RallyChris

File:I-105.png I-105 AlanOfTheBerg
File:I-205.png I-205 AlanOfTheBerg,

RallyChris

File:I-405.png I-405 AlanOfTheBerg


State Highway

Name Editor(s) Status Comments
File:OR-35.png SR-35 RallyChris Complete
File:OR-260.png SR-260 RallyChris Complete


Road Closures

This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.

Road Name Editor Closed Date Est Open Date Links and comments
OR180 AlanOfTheBerg 10/25/2011 10/27/2011 Railroad crossing reconstruction 7 miles East of Intersection with US20. Public Contact: Rick Little, 541.726.2442

WazeMap


Future New or Realigned Roads

Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.

Road Or Project Name Est Open Date Links and comments
I-5 at Del Rio Rd Sep 2011 ODOT will replace the Del Rio bridge over I-5 at the Winchester Interchange (Exit 129). All ramps for Exit 129 will move and Del Rio Rd and OR99 will be realigned.

ODOT Project Page

WazeMap