Oregon/Closures/Main: Difference between revisions View history

(*/Closures/Main*/ Removed Cascade Lakes Hwy closure, swapped US-26 projects)
(*/Closures/Main*/ Bly Mtn Project)
Line 92: Line 92:
|2014 - 2016
|2014 - 2016
|A 9.2-mile section of OR 140 will be straightened, widened, and repaved.
|A 9.2-mile section of OR 140 will be straightened, widened, and repaved.
9/16/15 Update: Realignment has been completed north of [https://www.waze.com/editor/?env=usa&lon=-121.39754&lat=42.35406&zoom=6 Dinner Plate Quarry] and the project is preparing to shut down for the winter.  Segments have been adjusted using project maps and the new GPS points layer.
[http://www.oregon.gov/ODOT/HWY/REGION4/pages/or140_ritter_rd_deer_run_rd/or140_ritter_rd_deer_run_rd.aspx ODOT Project Page]
[http://www.oregon.gov/ODOT/HWY/REGION4/pages/or140_ritter_rd_deer_run_rd/or140_ritter_rd_deer_run_rd.aspx ODOT Project Page]



Revision as of 18:21, 16 September 2015


Road Closures

This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.

Road Name Editor Closed Date Est Open Date Links and comments
Old McKenzie Pass Hwy OR242 AlanOfTheBerg 2014-11-13 9am 2015-06-15 Estimated ODOT press release on Nov 13, 2014 notifying of the seasonal closure of OR242 between the winter closure gates.

For 2014-2015, a closure has been entered in the Waze Map Editor.

KEEP THE FOLLOWING FOR FUTURE REFERENCE:

During the winter closure, highway name should be "! CLOSED ! State Hwy 242" and in the summer, when open, the standard name, "State Hwy 242" is fine.

Landmarks for the closure gates should be large in the winter for better app visibility. Shrink the landmark in the summer.

West-end Gate @ MP61.91

East-end Gate @ MP83.71

Future New or Realigned Roads

Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.

Road Or Project Name Est Compl Date Links and comments
I-5 @ Exit 24 Fern Valley Interchange (Phoenix) April 2014 - 2016 The Fern Valley interchange is expected to be constructed using a 'crossing' or 'diverging diamond' design that provides a higher capacity to move traffic while requiring lower right-of-way needs.

AlanOfTheBerg has upgraded several area roadways to Major Highway or Minor Highway or Primary Street in order to encourage Waze navigation to more easily accept these alternate routes.

October 2014 will see bridge beam sets on Bear Creek, and in November the beam sets over I-5 should commence.

Traffic Cameras in the area

August 2013 City Council meeting with some detailed final and interim road maps.

ODOT Fern Valley Interchange Project Page

WazeMap

I-5 @ OR214/OR219 (Woodburn) Summer 2013 - 2015 ODOT and City of Woodburn have agreed (June 11, 2012) to a design package and approved moving forward with the rebuilding of the interchange on I-5 at MP271.

ODOT I-5 at Highway 214 Project Page

WazeMap

US20 Pioneer Mountain to Eddyville Phase 3: 2016 ODOT is bypassing a winding section of existing US20. This project has been on-going since 2007. There have been several delays, including landslides and bridge supports being bent, or going out-of-plumb after installation.

Phase 3 started in 2014, estimated to go through 2016. New fill is being added with sensors to detect movement before continuing on with the roadway

ODOT Project Page

WazeMapWazeMap]

US-26 Safety and Preservation Project 2014 - 2016 Safety improvements to a section of US-26 west of Government Camp. Map curve will be realigned to create a softer turn.

ODOT Project Page WME Link

Newberg-Dundee Bypass 2013-2016 Phase 1 groundbreaking took place August 29, 2012 at the location of the new junction near OR219 and Wynooski Rd. Construction is planned to begin in 2013. Full plan is to build a bypass for OR99W south of Newberg and Dundee between the OR18/OR99W interchange to a new interchange on 219 then to S Sprinbrook RD. then to 99w.

ODOT Newberg-Dundee Bypass Project Page

To see the map of the new HWY section see Map of new HWY WazeMap

OR 140 Ritter Road to Deer Run Road 2014 - 2016 A 9.2-mile section of OR 140 will be straightened, widened, and repaved.

9/16/15 Update: Realignment has been completed north of Dinner Plate Quarry and the project is preparing to shut down for the winter. Segments have been adjusted using project maps and the new GPS points layer. ODOT Project Page

WME Link