User:Rfrsw101/Editing Videos View history

(Added Specific UR Replies)
 
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
These UR replies are drafted for very specific situations. Spots where there are ampersands "&&&" should be replaced with the proper information. In most cases, that is asking the reporter "What's up here?"
This page holds short videos I have created for basic editing skills. They are stored on my Dropbox, the links being made for public view.


'''The Rockaways - Rebuilding/Bad SatImg/Bad WSV'''
====Fixing Gore Points====
How to fix a [[Glossary#Gore Point|gore point]] without disconnecting any segments from the node, thereby preserving all traffic data at that node. It is very important while we edit to preserve as much as (if not all of) the traffic data in areas that we work on. Make sure to check your angles per this page [[Junction_Style_Guide/Interchanges#Exit_geometry|Exit Geometry]].  [https://drive.google.com/open?id=1poDZpvn-4U_sAkF2c7WYh-6YpxlGcQng Fixing Gore Points]


Hi, my apologies if all my questions seem repetitive and long-winded. However, the satellite images and street views for the Rockaways are out of date. I know there has been much reconstruction after Sandy, so the volunteers are relying on information solely from the reporters. &&&
====Creating Junctions====
* How to create a junction from two intersecting segments at the same elevation. [https://drive.google.com/open?id=1zSAXK0EaW7gTcpEg6hoQhwvUq0N6aeas Creating Junctions]


'''Missed Event Closure/Closure ran too long'''
* This is being used more as we slowly implement the standards for at-grade [[Railroad#Railroad|Railroad Crossings]]. NOTE: Due to the changes in Non-Drivable Road Segments, there is an extra step required to be able to properly junction an at-grade railroad. This step is simply to change the non-drivable segment into drivable, junction the roads, and ''remembering to set the non-drivable road back to its original!''. [https://drive.google.com/open?id=1sr6lxJ7Y_zlwRN_3DRu0ySVXvucM8alb Creating Railroad Junctions]
 
Thanks for the report! This closure was part of the &&& event. The event is now over and we are cleaning up reports and closures.

Latest revision as of 00:55, 28 November 2017

This page holds short videos I have created for basic editing skills. They are stored on my Dropbox, the links being made for public view.

Fixing Gore Points

How to fix a gore point without disconnecting any segments from the node, thereby preserving all traffic data at that node. It is very important while we edit to preserve as much as (if not all of) the traffic data in areas that we work on. Make sure to check your angles per this page Exit Geometry. Fixing Gore Points

Creating Junctions

  • How to create a junction from two intersecting segments at the same elevation. Creating Junctions
  • This is being used more as we slowly implement the standards for at-grade Railroad Crossings. NOTE: Due to the changes in Non-Drivable Road Segments, there is an extra step required to be able to properly junction an at-grade railroad. This step is simply to change the non-drivable segment into drivable, junction the roads, and remembering to set the non-drivable road back to its original!. Creating Railroad Junctions