GooberKing (talk | contribs) No edit summary |
(fixing double redirection) |
||
(5 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Rhode Island]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[How to handle road closures]] before making changes to the map & this page. | Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Rhode Island]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures | How to handle road closures]] before making changes to the map & this page. | ||
Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks. | Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks. | ||
Line 11: | Line 11: | ||
! scope="col" width="100" bgcolor="wheat"| Link | ! scope="col" width="100" bgcolor="wheat"| Link | ||
|- align="center" | |- align="center" | ||
| [https://www.waze.com/editor/?env=usa&lon=-71. | | [https://www.waze.com/editor/?env=usa&lon=-71.41783&lat=41.82805&layers=1925&zoom=5&segments=43537952 '''Exit 22''']<br/>I-95 S|| 10/6/2014<br/>(GooberKing) || Approx.<br>October 2015 || '''RAMP MOVED'''<br/>New temporary ramp while old ramp is replaced || [http://www.ri.gov/press/view/23036 RIDOT] | ||
|- align="center" | |- align="center" | ||
| [https://www.waze.com/editor/?env=usa&lon=-71. | | [https://www.waze.com/editor/?env=usa&lon=-71.43814&lat=41.82446&layers=1925&zoom=7&segments=83427286 '''Atwells Ave''']|| 01/05/2015<br/>(GooberKing) || Approx.<br>January 2016 || '''BRIDGE CLOSED'''<br/>Bridge closed for rehabilitation || [http://www.ri.gov/press/view/23622 RIDOT] | ||
|- | |- | ||
|} | |} | ||
== | == Richmond == | ||
{| border="1" width="100%" | {| border="1" width="100%" | ||
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets | ! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets | ||
Line 25: | Line 25: | ||
! scope="col" width="100" bgcolor="wheat"| Link | ! scope="col" width="100" bgcolor="wheat"| Link | ||
|- align="center" | |- align="center" | ||
| [https://www.waze.com/editor/?env=usa&lon=-71. | | [https://www.waze.com/editor/?env=usa&lon=-71.55856&lat=41.48411&layers=1925&zoom=6&segments=65067855 '''Railroad Ave'''] || 12/23/2014<br/>(GooberKing) || Approx<br/>August 2015 || '''ROAD CLOSED'''<br/>Repair Rte 138 Overpass || [http://www.ri.gov/press/view/23634 RIDOT] | ||
|- | |- | ||
|} | |} |
Latest revision as of 12:43, 24 March 2015
Use this page to keep track of LONG TERM Road Closures & Changes to Traffic Flow in the State of Rhode Island. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read How to handle road closures before making changes to the map & this page.
Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week). At this point please only map closures that are in effect for more than two weeks.
Providence
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Exit 22 I-95 S |
10/6/2014 (GooberKing) |
Approx. October 2015 |
RAMP MOVED New temporary ramp while old ramp is replaced |
RIDOT |
Atwells Ave | 01/05/2015 (GooberKing) |
Approx. January 2016 |
BRIDGE CLOSED Bridge closed for rehabilitation |
RIDOT |
Richmond
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Railroad Ave | 12/23/2014 (GooberKing) |
Approx August 2015 |
ROAD CLOSED Repair Rte 138 Overpass |
RIDOT |
Warwick
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
Tidewater Dr | 9/22/2014 (GooberKing) |
Approx June 2015 |
BRIDGE CLOSED Mill Creek Bridge Reconstruction |
Town of Warwick |
Template
This is the template for the tables in this page.
Road Name Cross Streets |
Start Date (Username) |
End Date (Username) |
Notes | Link |
---|---|---|---|---|
<ROAD NAME> b/w <CROSS STREETS> |
Approx 1/1/20XX (<USER>) |
Approx 9/7/20XX (<USER>) |
ROAD CLOSED Description |
<LINK> |