CoolCityCat (talk | contribs) |
CoolCityCat (talk | contribs) |
||
Line 76: | Line 76: | ||
|- | |- | ||
|'''E5''' | |'''E5''' | ||
|[http://en.wikipedia.org/wiki/Shah_Alam_Expressway Shah Alam Expressway (KESAS)] | |[http://en.wikipedia.org/wiki/Shah_Alam_Expressway Shah Alam Expressway (KESAS)] <br> ''Lebuhraya Shah Alam'' | ||
|Open | |Open | ||
| | | | ||
Line 88: | Line 88: | ||
|- | |- | ||
|'''E7''' | |'''E7''' | ||
|[http://en.wikipedia.org/wiki/Cheras%E2%80%93Kajang_Expressway Cheras-Kajang Highway (Grand Saga)] | |[http://en.wikipedia.org/wiki/Cheras%E2%80%93Kajang_Expressway Cheras-Kajang Highway (Grand Saga)] <br> ''Lebuhraya Cheras-Kajang'' | ||
|Open | |Open | ||
|2 | |2 | ||
|[[Expressway Progress Tracking (Malaysia)#E7 (Completed)|Completed]] | |[[Expressway Progress Tracking (Malaysia)#E7 (Completed)|Completed]] | ||
|- | |||
|'''E8''' | |||
|[http://en.wikipedia.org/wiki/Kuala_Lumpur_%E2%80%93_Karak_Expressway Kuala Lumpur-Karak Expressway] <br> ''Lebuhraya Kuala Lumpur-Karak'' | |||
|Open | |||
|2 | |||
| | |||
|- | |||
|'''E8''' | |||
|[http://en.wikipedia.org/wiki/East_Coast_Expressway East Coast Expressway] <br> ''Lebuhraya Pantai Timur'' | |||
|Closed | |||
|19 <br> (Phases 1 & 2) | |||
| | |||
|- | |- | ||
|'''E12''' | |'''E12''' |
Revision as of 17:40, 8 June 2013
← Back to Main Page (Malaysia)
Development and management of toll roads in Malaysia are regulated by the Malaysian Highway Authority (MHA). Toll collection and road maintenance are carried out by respective concessionaires.
In Malaysia, there are two toll systems; open and closed.
Closed-toll system highways are the ones which you take the Transit Ticket when you enter and pay toll (based on time and/or distance) when you exit, e.g. E6 North-South Expressway, Central Link (ELITE).
Open-toll system highways are the ones which you pay toll at toll booths on certain segments on the highway, e.g. E5 Shah Alam Expressway (KESAS).
There are also highways which employ both systems along its stretch, hence it shall be referred to as a Mixed-toll system when the entire highway stretch is mentioned. e.g. E1 North-South Expressway, Northern Route
Not all toll roads are Expressways and not all Expressways are toll roads.
Avoid Toll Roads Feature in Waze
In the Waze client app, you are able to manually select alternative toll-free routes from the menu after locking in your destination. Waze should give you a route which avoids closed-toll roads entirely and lets you enter open-toll roads with no toll booth segments. However, automatic toll-free route calculation via the Avoid Toll Roads feature has yet to be enabled for Malaysia, pending confirmation of toll road marking of the entire Malaysian expressway system by our map editors.
A target of 90% marked toll roads must be achieved before informing Waze Support, so they can release the Avoid Toll Roads setting in the client app, so Wazers can choose if they prefer toll-free routing on a regular basis.
You can now help Wazers in Malaysia to achieve this target, with a new feature available today in the map editor. Mark toll roads in your area by selecting road segments and flagging them Toll Road in segment properties.
Toll Road should be marked only on segments from toll booths (toll plazas) to the nearest free exit on both sides. Please use this method for both open-toll and closed-toll systems.
List of Toll Roads in Malaysia (plus progress chart)
For current updates and on-going discussion, please visit our forum.
Route Number | Route Name | Toll System | # of Toll Plazas | Flagging Progress |
---|---|---|---|---|
2 | Federal Highway, Route 2 Lebuhraya Persekutuan |
Open | 2 | Completed |
E1 | New Klang Valley Expressway (NKVE) Lebuhraya NKVE |
Closed | 7 | Completed |
E1 | North-South Expressway, Northern Route | Mixed | ||
E2 | North-South Expressway, Southern Route | Closed | ||
E3 | Second Link Expressway | Open | 4 | |
E5 | Shah Alam Expressway (KESAS) Lebuhraya Shah Alam |
Open | ||
E6 | North-South Expressway, Central Link (ELITE) | Closed | ||
E7 | Cheras-Kajang Highway (Grand Saga) Lebuhraya Cheras-Kajang |
Open | 2 | Completed |
E8 | Kuala Lumpur-Karak Expressway Lebuhraya Kuala Lumpur-Karak |
Open | 2 | |
E8 | East Coast Expressway Lebuhraya Pantai Timur |
Closed | 19 (Phases 1 & 2) |
|
E12 | Ampang-Kuala Lumpur Elevated Highway (AKLEH) | Open | 1 | Completed |
E13 | Kemuning-Shah Alam Highway (LKSA) | Open | 2 | Completed |
E24 | Tun Salahuddin Bridge | Open | 1 | Completed |
E37 | East-West Link Expressway / Salak Expressway | No toll | 0 | Not applicable |
E37 | Kuala Lumpur-Seremban Expressway | No toll | 1 (to enter E2 only) | Completed |