Translations:Venezuela/MMR 2015/42/en-gb View history

No edit summary
No edit summary
 
Line 1: Line 1:
[[File:UturnDobleSeg.png|300px|right|border]]When cases where the '''road is divided into two (a segment for each direction, as shown in [[MapRaidPUE#Trazo_de_v.C3.ADas_de_doble_sentido|the diagram of the previous section]]), a U-Turn must be a segment connecting both dirctions, and it should measure '''16 meters''' or more.
[[File:UturnDobleSeg.png|300px|right|border]]When cases where the '''road is divided into two''' (a segment for each direction, as shown in [[MapRaidPUE#Trazo_de_v.C3.ADas_de_doble_sentido|the diagram of the previous section]]), a U-Turn must be a segment connecting both dirctions, and it should measure '''16 meters''' or more.
{{clear}}
{{clear}}

Latest revision as of 20:32, 19 November 2015

When cases where the road is divided into two (a segment for each direction, as shown in the diagram of the previous section), a U-Turn must be a segment connecting both dirctions, and it should measure 16 meters or more.